Capability Maturity Mangement and Integration
CMMi level 3 Certified company
The functions and features of CMMI are to insure there are no bad blocks of memory. CMMI helps to solve the maturity problem of software within a organization.
Capability Maturity Model
What are the CMMI,ISO9001:200 and SIX SIGMA? what are the uses with these?
Levels are used in CMMI to describe an evolutionary pathrecommended for an organization that wants to improve the processesit uses. A CMMI organization certified on a certain level, just denotes that the organization satisfies the criteria required by CMMI certification level.
SEI is the Software Engineering Institute. CMM stands for Capability Maturity Model. CMM has been replaced by CMMI (Capability Maturity Model Integration). For full details, go to http://www.sei.cmu.edu/cmmi/faq/comp-faq.html.
The standard is usually referred to as CMMI Level 5. SEI, the Software Engineering Institute, is the body that created the standard.
HCL is just CMMi Level 3. This is confirmed by HCL employee.
CMMi means Capability Maturity Model Integration
There are over 50 CMM Level 5 companies in India. Applitech Solution Limited Ahmedabad, CBS India Chennai/Bangalore, Citicorp Overseas Software Limited Mumbai, DCM Technologies Hyderabad, FCG Software Services (India) Pvt. Ltd. Bangalore, Covansys India Pvt. Ltd. Bangalore, ANZ Operations & Technology Private Limited Bangalore, HCL Technologies Limited Chennai, Hewlett Packard India Software Operations Limited Bangalore, LG Soft India Pvt. Ltd Bangalore, Mastek Limited Mumbai.
Polaris was the first company in the world to achieve CMMI Level 5 certification.
Azeus is CMMI Level 5 Headstrong is CMMI Level 3