TGI is the common name for a TJI, because it rolls of the tongue easier.
It is a Truss Joist I-beam. They come in a variety of depths, typically 9-1/2" to 16" and they come in different levels, 100, 200, 300, etc...
They consist of a top and bottom cord - which can be 2x3, 2x4, or an equivalent sized engineered wood material depending on the level. And between the top and bottom cord is OSB around 3/8" thick, again depending on the level.
They are similar for construction purposes to dimensional lumber (2x10 or equivalent) in that you order up a stack of a certain length and cut them to length as needed. They don't need X bracing but can require extra "squash" blocking under bearing walls.
They have small knock-out holes for wiring and can have holes cut through them, based upon certain criteria. For example, a 14" deep TJI can have up to an 8-1/2" hole, in certain locations. Can't do that with a 2x10.
Depending on how your floor system is designed, it can be just as rigid as any other floor system. If you go 24" o/c with 3/4" sheeting, most floor systems will give you some bounce. So add a couple of joists and go 19.2" or 16" o/c.
The drawback with TJI over dimensional or open web, is the burn-through time. A 2x10 or a 2x4 constructed open web will last longer in a fire than a TJI. Rumors that I've heard say that a fireman will never own a house with TJI's. Supposedly they could burn through and collapse within 5min. But that could always be overcome with a product like No-Burn which reduces the flame spread rating of lumber to make it practically non-combustible.
That depends where you are. http://www.tgifridays.co.uk/Nearest-TGI-Fridays The TGI website allows you to enter your postcode and will find the closest TGI to you
No, TGI Friday is not open on Thanksgiving.
Floor joist or ceiling joist? Floor joist have a board on the end all the way along the side of the building called a rim joist. Like the cross bar on the top of a T. Ceiling joist are nailed down into the top plate of the wall and to the rafters where possible.
A joist is a beam, a supporting structure in a building. The roof joist was riddled with dry rot and had to be replaced.
it depen on the size of the joist
The acronym tgi in tgi Friday stands for Thank God it's. The whole name is Thank God it's Friday. This restaurant name is popular because everyone likes to spend their Friday there.
tgi fridays open on easter sunday
A 20 delta size nail should be used to attach the band joist to a joist when end nailing. A 16 D can also be used.
There are several ways, but probably the easiest way would be to temporarily buck under the afflicted ceiling joist with a 2x6 temporarily, until the joist is in line with the others. Then go into the attic and cut and attach a 2x6 to the joist and vertically to the roof ridge. Remove the buck. The joist should stay in place.
no
In the UK there are 60 TGI fridays. i would name them but there are too many LOL
A joist note on a first floor plan would refer to the Joist below that floor, a joist note on the third floor plan woud be for that floor.