Want this question answered?
you implement the logic to Develop a programme and you deploy the programme to the customer to use and give feedback.
The Least Slack Time scheduling algorithm is used for assigning priority based on the slack time (temporal difference between the deadline, ready time and run time) of a process.
A multi-level feedback queue scheduling policy gives preference to short and I/O bound processes, it also rapidly establishes the nature of a process and schedules it accordingly. Multi-level feedback queues work on priorities. Processes are placed in separate queues based on their priority, this in turn is based on their CPU consumption and If a process uses too much of the CPU, it will be given a lower priority and therefore get less CPU time than fast and I/O bound processes. Any processes that do not complete in their allocated time slice / quantum are demoted to a queue of less priority, these lower priority queues generally have larger quantums / time slices. Each of the queues may use a different scheduling algorithm, this is done to make the overall scheduling method as efficient as possible. The features that may vary between different multi-level feedback queue scheduling methods are: - The number of queues - The scheduling algorithm assigned to each queue - The method used to promote/demote processes to different queues - The method that determines which queue a process enters --- Thomas Lee
An ordinary amplifier can have high gain but is unstable, drifts, can oscillate, etc. An amplifier with negative feedback has lower gain but is stable, does not drift, won't oscillate, etc.
All negative feedback systems, whether they be electronic, biological, or anything else, work by applying a negative feedback to the source signal, which is proportional in some way to the source signal. If the factor by which the amplifier corrects is high enough, oscillation will result (perhaps even runaway oscillation) How you make it happen depends upon the amplifier you use however -- though most work similarly enough. You could use a delay between output and feedback, or you could rely on a large amplifier gain.
It would seem that the difference between high and low level scheduling would be determined by the priority/necessity/importance of the subject in question, as related to the purposes/goals of the organization.
1
difference between feedback and control
Multilevel disc desiccation is a health condition of the spine. This health condition or disease is the loss of fluid between the discs of the spine. This fluid or jelly acts as cushion for the spine against pain. Multilevel disc desiccation is a degenarative disease.
Difference between intrinsic and extrinsic feedback?
positive feedback is always benificial but regenerative feedback may or may not.
Facilities Scheduling is used to schedule date and time slots for facilities in order to ensure that there are no scheduling conflict between any parties and to facilitate planning.
One is weighted, the other is not. Simple as.
jhfgg
you implement the logic to Develop a programme and you deploy the programme to the customer to use and give feedback.
what relationship exists among the layout decisions,capacity decisions and scheduling
when a woman's contractions speed up during labor is negative or positive feedback