Average direct labor cost is the opening direct labor cost + closing direct labor cost / 2
Total Manufacturing Cost = Direct Material + Direct Labor + Factory Overheads Prime Cost = Direct material + Direct Labor Conversion Cost = Direct Labor + Factory Overhead So yes prime cost and conversion cost is equal to total manufacturing cost
direct material cost , direct labor cost , manufacturing cost
No, Conversion cost is the sum of direct labor cost and manufacturing overhead cost.
Prime cost basically is the cost of direct labor and cost of direct material; whereas conversion costs is Overhead cost and direct labor cost.
Manufacturing plant manager is not directly related to manufacture of unit of product that's why it is not direct labor cost instead of that it is indirect cost and goes to overhead account
Total Manufacturing Cost = Direct Material + Direct Labor + Factory Overheads Prime Cost = Direct material + Direct Labor Conversion Cost = Direct Labor + Factory Overhead So yes prime cost and conversion cost is equal to total manufacturing cost
Formula for prime cost = direct material + direct laborFormula for conversion cost = direct labor + manufacturing overheads
false, direct labor and manufacturing overhead = conversion cost
direct material cost , direct labor cost , manufacturing cost
Manufacturing Overheads = 20% of Conversion CostTotal Conversion Cost = ?Total Conversion Cost = Direct Labor + Manufacturing Overheads100% = 80% + 20%Total Conversion Cost = direct labor * 100/80Direct labor = 38000Total Conversion Cost = 38000 * 100/80Total Conversion Cost = 47500Manufacturing Cost = Total Conversion Cost - Direct LaborManufacturing Cost = 47500 - 38000Manufactruring Cost = 9500
No, Conversion cost is the sum of direct labor cost and manufacturing overhead cost.
Variable manufacturing overhead cost per direct labor hour means the variable overhead cost spent for one single labor hour and formula is as follows:Variable overhead cost per labor hour = total variable overhead cost / Total direct labor hours
Prime cost basically is the cost of direct labor and cost of direct material; whereas conversion costs is Overhead cost and direct labor cost.
Manufacturing plant manager is not directly related to manufacture of unit of product that's why it is not direct labor cost instead of that it is indirect cost and goes to overhead account
Salaries and wages of workers directly involve in goods manufacturing is direct labor cost.
Direct labor cost is that labor which directly related with manufacturing of products like machine workers etc while indirect labor cost is that labor cost which directly not manufacturing product but required as well like line mangers or factory supervisors salary etc.
Direct labor cost is the salaries and wages of all workers directly involved in manufacturing of goods.