answersLogoWhite

0

Professional landscape companies usually charge between $75-$120 an hour, plus an additional $25-$35 extra for each crew member. Plant materials and fertilizations cost extra, plus custom landscape designs cost between $500-$2000 depending on the job.

User Avatar

Wiki User

12y ago

What else can I help you with?

Related Questions

Has there been a labor shortage in the lawn and landscaping industry?

The labor shortage has been felt across the lawn and landscaping industry,


What should the relationship of material cost to labor cost be?

multiply the cost of labor by the cost of materials. add the cost of labor and materials. subtract the cost of labor from materials. divide the cost of labor by the cost of materials. which one is correct


What do you mean by labor cost variance?

Labor cost variance means the difference between standard labor cost and actual labor cost.


What is the average cost to hire a landscaping photographer?

10,000 pounds


What is the average direct labor cost in manufacturing?

Average direct labor cost is the opening direct labor cost + closing direct labor cost / 2


Which factors of production are used by a landscaping service to provide economic?

labor, capital, and Natural Resources


Which factors of production are used by a landscaping service to provide economic value?

labor, capital, and natural resources


What Is An Example Of A physical labor?

Examples of physical labor include construction work, farming, landscaping, and manufacturing jobs that require manual exertion and physical strength.


Is labor rates and labor cost are the same thing?

Rates is cost-per-hour, labor cost is the total, regardless of time.


When would you use direct labor as cost driver?

In labor intensive industry direct labor cost is used as cost driver.


Is direct labor cost a relevant cost?

If direct labor cost creates impact or influences the decision then it is relevant cost but if direct labor is not creating influence or changing in decision then it is irrelevant cost for example direct labor cost remain same irrespective of whatever the decision then direct labor cost is also irrelevant.


Is indirect labor a variable cost?

If indirect labor change with the change of units of product then indirect labor is a variable cost. If change in the quantity of units has no impact on indirect labor cost then it is a fixed cost.