The control phase is the phase of dmaic is designed to insure that the problem does not re occur.
control phase
Control - The C of DMAIC
Control
control
Improve
The Hawthorne Effect
Composting is a natural process. Methods may have improved but no one invented it.
using scientific tables of elements
SO that the excess heat do not cause any problem.
The Chlorine Generation Process:Most of the packaged chlorine available today is manufactured by the salt process. There are three types of electrolyticcells: diaphragm, mercury and membrane. There are other methods of production, which are designed to fit the raw materialcontaining the chlorine ion. These methods include the electrolysis of hydrochloric acid, the salt process, and the HCloxidation process.
control
control
Control
D Define a problem or improvement opportunity.M Measure process performance.A Analyze the process to determine the root causes of poor performance; determine whether the process can be improved or should be redesigned.I Improve the process by attacking root causes.C Control the improved process to hold the gains.
Apparently there were problems with the program Moshi Monsters had designed to monitor messages. The program has been removed and is in the process of being improved.
The controls in cdm process are designed to reduce or eliminate risk.
ultrasonic vibrations
Digestion
The system should be analyzed to find out if its process and parts can be improved.
The controls in the Composite Risk Management process are designed to reduce the risks of the process being addressed. The controls are meant to balance the risks and the benefits of any process.
It was an inovative and magical process that changed the world and many thought that the process would never be improved.
Enterprise applications are designed to support organization-wide process coordination and integration