Substations usually use crushed limestone in the ground design to help minimize GPR (ground potential rise) within the substation. Without getting too technical, it helps keep the step and touch potential within limits so people working in the substation aren't hurt.

User Avatar

Wiki User

12y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Why flooring of substation is done with stones?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is green field substation?

In my line of work that is an Electrical High Voltage substation that is brand new. It is being built from a green field into an energized fully functional substation yard. There is no existing substation or remodeling of an existing one being done.


What sort of flooring is done in badminton hall?

Taraflex flooring is good for badminton.


Is vinyl flooring the cheapest type of flooring you can get?

Vinyl flooring or tile is a pretty cheap flooring option. However painted concrete flooring is also inexpensive and can be very attractive if done nicely.


Is engineered wood flooring or wood flooring better.?

Engineered flooring is a type of flooring that comes under the wood flooring category. You can get engineered flooring done at your home as it is non susceptible to water and can withstand any pressure. It keeps a normal temperature irrespective of any weather conditions. Cleaning is also not an issue. Thus, engineered flooring is a great option if you have been planning to get flooring done for your house or office.


What is a mini-substation?

A substation that is smaller than the average substation. A substation converts electric power from one voltage to another.


What is pooling substation?

The Substation which comes power from the power plant know as pooling substation.


Is Mannington flooring hard to install?

"Mannington Flooring is fairly hard to install. It is recommended by the company to have it done professionally and if not done by a professional, they ask that you read the instructions very carefully."


When was Jefferson Substation created?

Jefferson Substation was created in 1909.


When was Neuhof Substation created?

Neuhof Substation was created in 1985.


When was Concourse Yard Substation created?

Concourse Yard Substation was created in 1933.


Is quick step flooring easy to install?

Quick step flooring is a laminate flooring process. It comes in planks and has a clipping mechanism to hook each plank together. This process is thought to be easier than most flooring installations and can be done by most people on their own.


How do you install floating engineered flooring?

Floating an engineered wood flooring is done using an underlay between the sub floor and the new floor and then the engineered flooring is laid over the top and glued at the tongue and grooves to keep it together. if the flooring is a click joint then gluing is not required.