Best Answer

In order to determine the rate of a particular item, the factors affecting the rate of that item are studied carefully and then finally a rate is decided for that item. This process of determining the rates of an item is termed as analysis of rates or analysis.

The rate of particular item of work depends on the following:

1. specification of works and material about their quality, proportion and constructional operation method.

2. Quantity of materials and their costs.

3. Cost of labours and their wages.

4. Location of site of work and the distances from source and conveyance charges.

5. Overhead and establishment charges

6. Profit

Cost of materials at source and at site of Construction:

The costs of materials are taken as delivered at site inclusive of the transport local taxes and other charges.

Purpose of Analysis of rates:

Purpose of Analysis of rates:

1. To work out the actual cost of per unit of the items.

2. To work out the economical use of materials and processes in completing the particulars item.

3. To work out the cost of extra items which are not provided in the contract bond, but are to be done as per the directions of the department.

4. To revise the schedule of rates due to increase in the cost of material and labour or due to change in technique.

Cost of labour -types of labour, standard schedule of rates:

The labour can be classified in to

1) Skilled - 1st class

2) Skilled - 2d Class

3) Unskilled

The labour charges can be obtained from the standard schedule of rates 30% of the skilled labour provided in the data may be taken as Ist class, remaining 70% as II class. The rates of materials for Government works are fixed by the superintendent Engineer for his circle every year and approved by the Board of Chief Engineers. These rates are incorporated in the standard schedule of rates.

Lead statement: The distance between the source of availability of material and construction site is known as "Lead " and is expected in Km. The cost of conveyance of material depends on lead.

This statement will give the total cost of materials per unit item. It includes first cost, conveyance loading, unloading stacking, charges etc.

The rate shown in the lead statement are for metalled road and include loading and staking charges. The environment lead on the metalled roads are arrived by multiplying by a factor.

by,

Manoj Kumar,

Business Development

Rebus Business solutions LLC - Project Management Training & Consultant

User Avatar

Wiki User

9y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

12y ago

Not only in civil engineering but in all fields you require. Our goal to achieve best quality in least possible price

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Why rate analysis is important in civil engineering?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is star rate in civil engineering?

Civil Engineering generally has a five-star rating, meaning good employment with higher pay.


What are the top ten hardest board exams in the Philippines?

1. Electronics Engineering 2. Chemical Engineering 3. Law 4. Physician 5. Accountancy 6. Civil Engineering 7. Electrical Engineering 8. Architecture 9. Mechanical Engineering 10. Nursing


What is the average hourly rate for an engineering consultant?

What is the hourly rate for mechanical engineer


What is the unemployment rate for manufacturing engineering jobs?

I was unable to find the unemployment rate for manufacturing engineering jobs, but I was able to find the unemployment rate for production occupations. For more unemployment rates, visit: http://www.bls.gov/news.release/empsit.t13.htm


What is the unemplyment rate for manufacturing engineering jobs?

I was unable to find the unemployment rate for manufacturing engineering jobs, but I was able to find the unemployment rate for production occupations. For more unemployment rates, visit: http://www.bls.gov/news.release/empsit.t13.htm


When choosing a person for the civil service the Tang dynasty considered this the most important factor?

Merit.PS. I'm twelve.


What is the employment rate for jobs related to chemical engineering?

In the USA, according to the Bureau of Labor Statistics, there were 30,200 jobs for chemical engineers in 2010. An employment rate of 6%. In Canada the employment rate for chemical engineering is described as "fair", and the outlook as "lukewarm".


What is the pay rate for a sales engineering job?

The current pay rate for a sales engineering job varies greatly depending on many factors. Education, experience and location make a really big difference.


What question can be ask in an interview as a quantity surveyor?

When does rate analysis required to do


What has the author Richard E Barlow written?

Richard E. Barlow has written: 'Statistical theory of reliability and life testing: probability models' -- subject(s): Statistical methods, Reliability (Engineering), Accelerated life testing 'Reliability growth during a development testing program' -- subject(s): Reliability (Engineering) 'Tolerance and confidence limits for classes of distributions based on failure rate' -- subject(s): Reliability (Engineering) 'Reliability and Fault Tree Analysis'


How can you determine a banks earnings credit rate business?

Have the bank fax over an Account Analysis Statement. It should show all of the up to 87 different fees that they charge including those for "free checking" (LOL) accounts. It should also show the "Earnings Credit Rate". Its probably a good idea to the "Earnings Credit Rate" specifically when you request the Account Analysis Statement. These fees are important because they account for a large percentage of bank revenue.


What contributed to the high casualty rate on the Civil War?

diseases.