The surveys should take place before the construction to know that whether the soil is hard enough or stable enough to take the load of construction.

This survey is important so that the house or the building do not sink in.

User Avatar

Wiki User

10y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Why soil survey should be carried out before construction takes place?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the difference between without prejudice survey and survey on without prejudice basis?

A "without prejudice survey" is a survey conducted without revealing the identity of the participants or the purpose of the survey, allowing for more candid responses. On the other hand, a "survey on a without prejudice basis" typically means that the survey responses cannot be used as evidence in a legal proceeding.


Who is the smartest in Ohio?

A survey testing all the people in Ohio would have to be carried out before this could be ascertained. So far this has not been done.


How do you read a construction survey stake?

To read a construction survey stake, look for markings that indicate measurements or alignment. Typically, these markings include distance to a reference point, grade elevation, and other relevant information for the construction project. Consult the project's survey plans and coordinate with the site surveyor if there are any uncertainties.


Where does maharashtra stand in the recently carried out survey of human development?

In the recently carried out Human Development Index (HDI) survey, Maharashtra is among the top-performing states in India. It ranks high in terms of human development indicators such as education, health, and income levels. However, there are still areas where improvement is needed to ensure overall well-being and quality of life for all its residents.


How often is the American community survey carried out?

The American Community Survey (ACS) is conducted continuously throughout the year, with a sample of households receiving surveys each month. This ongoing data collection method allows the ACS to provide up-to-date information on social, economic, housing, and demographic characteristics of the U.S. population.


What is pilot survey?

Pilot Survey: a preliminary piece of research conducted before a complete survey to test the effectiveness of the research methodology. This should be completed before the final survey commences. The intention is to alert the surveyor to any difficulties that were not anticipated at the survey proposal stage. Pilot surveys are undertaken after pre-tests. Pilot Survey: a preliminary piece of research conducted before a complete survey to test the effectiveness of the research methodology. This should be completed before the final survey commences. The intention is to alert the surveyor to any difficulties that were not anticipated at the survey proposal stage. Pilot surveys are undertaken after pre-tests.


What is the primary stage of construction?

In civil engineering sector the primary stage of the construction is the field visit .ie rekhe survey


How is the gravity survey caried out today?

Gravity surveys are conducted today using highly sensitive instruments like gravimeters that measure the gravitational field of the Earth at different locations. These instruments are mounted on aircraft or vehicles to collect data across large areas quickly and accurately. The data is then processed to create maps showing variations in gravity, which can be used to understand subsurface geological features.


Why is the ordnance survey called the ordnance survey?

The name dates back to World War II. Much of the mapping carried out during the war was done by the Department of Ordnance (the guys who take care of munitions, artillery, tanks etc.). Their maps then, were known as Ordnance Survey maps. Today, Ordnance Survey maps are carried out by civilian teams and have nothing to do with ordnance but the name has stuck.


How do you inspect a work area to decide what cleaning needs to be carried out?

make an actual survey so that everything you needs should be bring in one setting to save time and effort


What should a survey goal focus on?

A survey should focus on how many people want what.


What is continuous machinery survey?

On the request of the owner a continuous survey may be carried out on the hull which all compartment of the hull are opened for survey and testing in rotation, with a five year interval between examination of each part.