i have 1 week pregnency but i have been bleeding what should i do.
I would say it would be and could be longer as well depending on what your tickets were in.
Bleed American was created on 2001-07-18.
http://www.everydiet.org/diet/18-pounds-in-4-days This site gives you information on how you can lose 18 pounds in 4 days. However this is never a good idea to attempt and losing weight should be a longer process then four days for it to be healthy for you.
As of today (Nov 3rd) - there are 15 more days.
18 days and 8 hours.
Eighteen days
The average length of a year in the Gregorian Calendar is 365.2425 days. 18 years would thus equal on average 6574.365 days. The exact number would be 365 * 18 (= 6570) + number of leap years during those 18, which may vary between 3-5. So, 18 years is anything between 6573 - 6575 days.
This depends on how long your menstrual cycle is. The usual cycle is 28 days long. Day one of the cycle is the first day of your period. If your period lasts for five days then take five away from 28 and you will have 23 days before your next period starts. Some people could have a 32 day cycle and some could have 24 a day cycle or anything between. Also, some women bleed for 2 days only and some bleed for 5 or 6 days so you could have a 24 day cycle and bleed for 6 days. This would mean that you will have 18 days between periods, or, you could have a 32 day cycle but only bleed for 2 days. In this case you would have 30 days between your periods. We are talking here about regular periods. If you have bleeding that is not regular then maybe a trip to the doctor will provide some reassurance.
Well, buckle up, buttercup. If 25 men can build a house in 18 days, that means it takes 25*18 = 450 man-days to build the house. Now, if you throw 15 men into the mix, you just need to divide those 450 man-days by 15 to find out how many days it will take them. So, 450 man-days divided by 15 men equals 30 days for those fellas to build that house.
That would be November 15th.
To solve this problem, we can use the concept of man-days. If 6 tractors take 8 days to collect the harvest, they complete the work in 6 x 8 = 48 man-days. Therefore, for 18 tractors to do the same work, they would take 48 man-days / 18 tractors = 2.67 days. So, it would take approximately 2.67 days for 18 tractors to collect the harvest.
3decimeters is longer than 18 centimeters