answersLogoWhite

0

Units for work

User Avatar

Anonymous

12y ago
Updated: 5/21/2024

Work is energy. Any unit of energy can be used to describe a quantity of work.

Units of energy always boil down to (a length unit) times (a distance unit), though

these may be disguised. Some popular units of work/energy are . . .

-- newton-meter

-- foot-pound

-- dyne-centimeter

-- inch-pound

-- watt-second

-- joule

-- horsepower-hour

-- calorie

-- kilowatt-hour

The [ton-furlong], though dimensionally correct, is seldom used.

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

In what units is work measured?

Work is typically measured in units of joules (J) or in the case of mechanical work, in units of newton-meters (Nm).


Is this true that work and energy have the same units?

Yes, work and energy have the same units. Both work and energy are measured in joules (J) in the International System of Units (SI).


What are the units for work done?

The units for work done are joules (J) in the International System of Units (SI). Another common unit for work is the erg in the centimeter-gram-second system.


What are the possible units for work and power?

The units for work are joules (J) in the International System of Units (SI). The units for power are watts (W), which is equivalent to one joule per second (J/s).


What are the dimensions of a rectangle that has a perimeter of 44 units and an area of 105 square units?

The dimensions work out as 7 units and 15 units


Are the units for work and energy equivalent?

Yes, the units for work and energy are equivalent. Both work and energy are measured in joules (J) in the International System of Units (SI). Work is the transfer of energy, so it makes sense that they share the same unit of measurement.


What unit would you use to measure width of a football pitch?

Yards if you work in imperial units or metres if you work in metric units


What are the units of work done?

The unit of work done is the joule (J) in the International System of Units (SI). It can also be expressed in other units such as calories or kilowatt-hours depending on the context.


What is exact difference between integration and system testing?

After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.


What is the dimension for work done?

The dimension for work done is energy, which has units of joules (J) in the International System of Units (SI).


What are the units of work involved in this project?

The units of work involved in this project are typically measured in hours or days, depending on the complexity and scope of the tasks.


What are units of measuring work?

Work is measured in joules per second