0.167 cubic meters in 44 gallons.

User Avatar

Wiki User

15y ago

What else can I help you with?

Related Questions

How to calculate how much concrete is needed for a project?

To calculate the amount of concrete needed for a project, you need to determine the volume of the area to be filled with concrete. This can be done by multiplying the length, width, and height of the area. Once you have the volume, you can then calculate the amount of concrete needed by dividing the volume by the coverage area of one cubic yard of concrete. This will give you the total number of cubic yards of concrete needed for the project.


What do gallons measure?

Sure, gallon is a measure of volume; you can measure or calculate the volume of a person.Sure, gallon is a measure of volume; you can measure or calculate the volume of a person.Sure, gallon is a measure of volume; you can measure or calculate the volume of a person.Sure, gallon is a measure of volume; you can measure or calculate the volume of a person.


How much concrete for 12 feet by 4.5 feet?

The depth of the pour would also be necessary to calculate the volume of concrete needed.


How many 80 pound bags of concrete will it take to fill a 55 gallon drum?

To determine how many 80-pound bags of concrete are needed to fill a 55-gallon drum, first calculate the volume of the drum. A 55-gallon drum holds about 7.4 cubic feet (since 1 gallon is approximately 0.133 cubic feet). An 80-pound bag of concrete typically yields about 0.6 cubic feet. Therefore, you would need approximately 12 to 13 bags of concrete to fill the drum.


What weighs more one gallon of concrete or one gallon of water?

One gallon of water weighs approximately 8.34 pounds, while one gallon of concrete weighs around 20-25 pounds, depending on the specific mix. Therefore, one gallon of concrete weighs more than one gallon of water due to the additional weight of the aggregates and cement in the concrete mix.


How do you calculate Concrete volume on corrugated metal decking?

You need several quantities to calculate concrete volume for corrugated metal decking. You need both the flute height in inches, flute width in inches, flute foot in inches, sealant depth or thickness in inches, gap size in inches, and deck length in feet.


How do you calculate the weight of ready mix concrete?

To calculate the weight of ready mix concrete, you can use the formula: Weight = Volume × Density. First, determine the volume of concrete needed, typically measured in cubic meters or cubic feet. Then, multiply this volume by the density of the concrete, which is usually around 2,400 kg/m³ (150 lb/ft³). This will give you the total weight of the ready mix concrete required for your project.


How to measure how much concrete do you need for your project?

To measure how much concrete you need for your project, calculate the volume of the area to be filled with concrete by multiplying the length, width, and height. Then, divide the total volume by the yield of the concrete mix to determine the amount needed in cubic yards or cubic meters.


How many pennies would it take to fill a 7 gallon jug?

To calculate the number of pennies needed to fill a 7-gallon jug, we need to consider the volume of a penny. A penny has a volume of approximately 0.36 cubic centimeters. One gallon is equivalent to approximately 3785 cubic centimeters. Therefore, a 7-gallon jug would have a volume of 26,495 cubic centimeters. Dividing the volume of the jug by the volume of a penny gives us approximately 73,597 pennies needed to fill a 7-gallon jug.


How concrete calculate?

Concrete is calculated by determining the volume required for a specific project, typically expressed in cubic meters or cubic feet. To calculate the volume, measure the length, width, and depth of the area to be filled, then use the formula: Volume = Length × Width × Depth. Additionally, consider the mix ratio and any necessary adjustments for factors like waste and compaction. Finally, convert the volume to the appropriate units to determine how much concrete is needed.


How much concrete is needed for a footer that is 12 inch by 3 foot deep?

To calculate the volume of concrete needed for a footer that is 12 inches wide and 3 feet deep, first convert the dimensions to feet. The width is 1 foot (12 inches) and the depth is already 3 feet. The volume is calculated using the formula: volume = width × length × depth. Assuming the length is 1 foot, the volume would be 1 ft × 1 ft × 3 ft = 3 cubic feet of concrete needed.


How much concrete do i need to fill a trench that is 10x14x 90'?

To calculate the volume of concrete needed to fill a trench that is 10 feet wide, 14 feet deep, and 90 feet long, you can use the formula for volume: length × width × depth. This gives you a volume of 90 ft × 10 ft × 14 ft = 12,600 cubic feet. Depending on how you plan to order the concrete, you may want to convert this volume into cubic yards by dividing by 27, resulting in approximately 466.67 cubic yards of concrete needed.