The weight limit for a truck crossing the bridge is 18 metric tonnes.
Tower Bridge is still a busy and vital crossing of the Thames: it is crossed by over 40,000 people (motorists and pedestrians) every day. (Wikipedia)
For the source and more detailed information concerning your request, click on the related links section (Wikipedia) indicated directly below this answer section.
More than 1000 cars per day cross the bridge.
20,000 cars
1000000
The harbour bridge was built on Saturday 19th March 1932. The pylon is used to hold the bridge from both ends. Then the arc was made and used cranes to hold them up in place. The there was the road being made and then the cconcrete.
The Golden Gate Bridge has an average of 120,000 cars and trucks passing over it every day. The bridge can, if necessary, stand a load of around 22,000 tons.
bridge hold is when we use the pallete knifes to cut the fruits out.
if you build an arch bridge it can hold more weight then anyother type of toothpick bridge and can hold about 20lbs (if made well) another good type of bridge is the truss bridge it is just as strong as the arch bridge but it has diffrent structures.
nipples
No
Bridge Stand is a part of bridge.Every bridge must have it ,it hold the bridge on a surface to let the bridge high to afar to the surface.
21,000,000
The seating capacity of the Sydney Opera House is 5,738 people. The Sydney Opera house is a performing arts venue in Sydney, Australia.
bridge hold is when we use the pallete knifes to cut the fruits out.
It is a pre-stressed concrete box girder bridge.
An arch bridge uses compression to hold itself together