Concrete is a mixture of cement, sand, stone, and water. In a cuibic meter of concrete, , there is about 0.3 cubic meters of sand, or about 475 kg
approx 0.7 mc of sand
0.8
How much cement sand and stone do you need for 1 cubic meter of concre
One cubic meter is the volume in this case. It is the same as 1000 liters.
twelve
A cubic meter of concrete weighs around 2.5 tons. The weight will vary somewhat with the composition, but usual concrete mixes (per cubic meter) contain 350 Kg of cement, 700 Kg of sand, 1,200 Kg of chippings and 150 liters of water.
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
The answer will depend on the substance whose volume is given. A cubic metre of dry sand probably contains no decatherms.
"1 cubic meter" is a perfectly good 'quantity'. If the 'quantity' you want is the weight instead, then you need to know a unit weight or density for sand, in order to convert a volume to a weight.
I'm assuming by bricki you mean aggregate? There are several different mixes of concrete that yield different strengths. One of the more common mixes is a 3/2/1 mix this combines 3 parts aggregate (crushed stone), 2 parts sand and 1 part portland cement. with this mixture to make 1 cubic meter of concrete you will need almost 1/2 cubic meter of aggregate, 1/3 cubic meter sand and 1/6 cubic meter portland cement mixed with about 75 liters of water. Different mixes use varying amounts of stone though the sand and cement mixture stays between 1 1/2 : 1 to 2:1
The mixture depends on the concrete strength, flow properties and other specifications required, quality of cement, aggregates and other chemical additives that will be used. Typically 1 cubic meter concrete should include about 310kg cement, 800kg sand, 900kg gravel and 220kg water.
100
The Question is mistake. The Question is How much sand and aggregate required for the one cubic meter of M20 grade concrete? Answer :- 20mm aggregate = 0.90M3 Sand = 0.45M3 to 0.5M3 depond on the Bulk density of Sand Cement = 320kg
The weight varies; but if it's dry sand, the cubic meter will weigh around 1500 kilos.