Time span where an event has to occur without affecting (increasing) the project duration.
The critical path is the set of activities that can't be put off -- they determine how long the project will take overall, and a delay in any of these activities will delay the project.You can always put off the slack, however, without increasing the total duration of the project. So the answer is "Yes, there can be no slack time in a critical-path network diagram."
normal time is calculated by... average cycle time x (% rating factor/100)
something that is made just in time to be sold or realsed.
Manufacturing Cycle Efficiency is value add (VA) time divided by non-value add(NVA) time. That is, in the entirety of a process flow or value stream flow, the total of value added time divided by the total of non-value added time. For example, total manufacturing cycle time of 28 days. Of the total, let's say there is 1 day worth of VA time and 27 days of NVA time. That means your cycle efficiency comes to 3.7%.
Physically, the constant represents the time it takes the system'sstep responseto reachof its final (asymptotic) value.
what is slack in project management
Free slack: The free slack of an activity is the time this activity can be delayed without impact on the following activity. Total slack: The total slack of an activity is the time this activity can be delayed without impact on the finish date of the project.
The Least Slack Time scheduling algorithm is used for assigning priority based on the slack time (temporal difference between the deadline, ready time and run time) of a process.
Slack means different things, depending on context. For this question, I assume that slack is the time that somebody is waiting for somebody else to do something. Slack simulation, then, is a simulation where you evaluate different efficiencies and/or worker/consumer ratios, in an attempt to minimize or optimize slack, i.e. wasted, time.
Slack or Float is the amount of time an activity can get delayed without delaying the overall end date of a project
do work and dont slack
the critical path determines the duration of the project and hence the finish date of the project given the start date. Slack time is relative to the total float.
What is slack time in project management
slack off laze around
According to Malhortra/Krajewski/Ritzman, In their book "Operations Management", The maximum length of time that a task can be delayed without procrastinating the whole project is called activity slack. Activity on a critical path has Zero slack. Information on slack is useful because it summit activities that call for close attention. In this respect, activity slack is the amount of timetable slippage that can be accepted for an activity before the entire project will be delayed. Slack at an activity is lessened when the assessed time duration of an activity is surpassed or when the planned start time for an activity must be put off because of resource considerations (1). 1- Malhortra Krajewski Ritzman, "Operations Management" , 9th Edition, Prentice Hall, NJ
organisational slack
Garland Slack's birth name is Garland Glenwill Slack.