The duration of Mumbai Express is 2.53 hours.
The duration of Mumbai-Pune-Mumbai is 1.68 hours.
The duration of Mumbai Calling is 1320.0 seconds.
The duration of Mumbai Cutting is 2.17 hours.
The duration of Mumbai Xpress is 2.53 hours.
The duration of Mumbai Matinee is 2.08 hours.
The duration of Chotta Mumbai is 2.5 hours.
Mumbai Express was created on 2005-04-15.
The duration of Mumbai Meri Jaan is 1.98 hours.
The duration of Mumbai Se Aaya Mera Dost is 2.45 hours.
The duration of The Express is 2.17 hours.
Mumbai Express - 2005 is rated/received certificates of: India:A India:UA (cut) Malaysia:U UK:PG
The duration of Chungking Express is 1.7 hours.