Updated: 12/14/2022
User Avatar

Wiki User

13y ago

Best Answer

During concreting first of all we have to take an adequate quantity of aggregate,sand,cement& water according to standard mix design.Then prepare a proper mix which is nothing but concrete

User Avatar

Wiki User

13y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What to do during concreting?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the correct term for putting down concrete concreting or laying concrete?

concreting, concrete pouring, concreting casting.


What is the remedy if pipe of concrete pump gets clogged during concreting?

Call doug @ Hyrdill in Wendell N.C.


What is allowable bulkage in sand for concreting and plastering works?

No


What is the jetgrout?

if do concreting through a pipe called jetgrout.


What is the effect of sharing in concreting?

Sharing will cause the bridge to collapse.


What is difference between first stage and second stage concrete used in powerhouses concreting?

In power house concreting during the installation of turbine units in their final location a second stage concrete is poured in order to embed the turbine units. A second stage concrete shall be non - shrinking,self compacting with quick setting admixtures for an early strength development


How can you view an Indian standard code online?

Indian standard for slifrom shuttering & concreting.


What has the author A J Newman written?

A J. Newman has written: 'Concreting and bricklaying in cold weather'


What has the author S A Mironov written?

S A. Mironov has written: 'The theory and methods of winter concreting'


What has the author A E PEATFIELD written?

A. E. PEATFIELD has written: 'Teach yourself practical concreting'


Pre stressed concrete compared to Post tensioned concrete?

Prestressed concete made using high tensile wires which is stressed (as per the design load) before concreting, and post tensioned concrete made of Strands covered with duct, in this, wires/strnads are stressed after concreting then the ducts are grouted using cement slurry..


Where to cut off girders or beams?

in building construction, where do you cut off a concrete beam if you cannot finish concreting on the said day?