USA Today reported its cost as 1.5 billion dollars USD as part of the overall total expenditure of 20 billion dollars USD for the complex known as Downtown Dubai.
The Burj Khalifa (as Burj Dubai) reached its apex in 2009 and was opened on January 4, 2010. The cost per square foot is extremely high, so some areas have still not been leased or occupied.
$ 1.5 billion
The cost is estimated to be US $2772 Per hour !!
1.5 billion dollars. The current tallest building is the Burj Khalifa.
The most expensive building is the Marina Bay Sands casino which cost an estimated 5.5 billion USD. For a list of the most expensive buildings in the world see the related link below.
It is not clear because Qutub Minar was built over many years and by different rulers of Delhi.
Direct labor budget utilized to compare the actual direct labor cost and standard cost for specific task and for controlling purpose so that if there are variances those variances could be eliminated to bring the actual cost to budgeted cost.
The actual are retrospective - they have occurred and have to entered in a budget document against what was budgeted so that you have the budget then actual and then you will find the difference plus or minus against budget. The date for actual comes from what has happened i.e. in a wage budget you will plan what you spent, after that period (month of the year) you will have the actual cost of the wage. The costs would be made available from the the department who make up the wages.
In a more simply way you divide the actual cost incurred by the projected budge/amount.
The country that financed the world's tallest building but suffered a deep financial crisis because of the enormous cost was Saudi Arabia.
The budget outlay plan actual investments of a nation divided by the number of population is the per capita cost