answersLogoWhite

0

AllQ&AStudy Guides
Best answer

curing time of concrete 14-28 days

This answer is:
Related answers

curing time of concrete 14-28 days

View page

It starts curing the second they put water in it.

View page

minimum curing period of concrete is 21 days and maximum is 28 days

View page
  • Yes, the vacuum dewatered concrete requires curing in order to gain its strength.
  • The concrete is cured for 28 days.
View page

It is the grade of concrete which indicates the strength of concrete after 28 days curing. M #) means the strength of concrete after 28 days of curing will be 30 N/mm2 .

View page
Featured study guide

Chemistry

12 cards

Substance that speeds up the rate of chemical reaction

Is Dihydrogen monoxide an example of a nonpolar molecule

Which process is often used to determine what coefficients to use to balance an equation

According to the Law of Conservation of Mass in a chemical reaction the total starting mass of all the reactants equals the total final mass of all the products true or false

➡️
See all cards
No Reviews
More study guides
No Reviews

No Reviews
Search results