If you are installing a new or rebuilt transmission and
converter, pour 1 qt of ATF into torque converter before assembly.
Add 4 qts of ATF after installation thru dipstick tube, start
engine and then add aprox 7 qts ATF into dipstick tube until
reading on dipstick says full.