answersLogoWhite

0

AllQ&AStudy Guides
Best answer

Once the moisture is out of the concrete and it is cured it should not shrink - it is however in a state of stress so make sure control joints are added to any large concrete areas that are poured and placed.

This answer is:
Related answers

Once the moisture is out of the concrete and it is cured it should not shrink - it is however in a state of stress so make sure control joints are added to any large concrete areas that are poured and placed.

View page

Wet concrete is caustic- it will burn your skin. Concrete DUST is not good to inhale- it may contain silica. Solid, cured concrete is about as hazardous as a rock.

View page

When referring to concrete work (using a structural suspeneded slab as an example)

Shoring - support structure for formwork before concrete is poured and while it is curing. The formwork is the plywood and the shoring is the posts.

Reshoirng - support structure for the cured or partially cured concrete - installed after the formwork and shoring have been removed. Usually used as additional support for the partial cured concrete (which has reduced strength) to allow construction work to continue on the slab until it has fully cured.

View page
  • Yes, the vacuum dewatered concrete requires curing in order to gain its strength.
  • The concrete is cured for 28 days.
View page

Green concrete could mean two different things. It could mean that the concrete isn't cured yet, or it could mean that it is supposed to be environmentally friendly.

View page
Featured study guide

Nouns

17 cards

Bride is to bridesmaids as groom is to

What is the concrete noun of love

Why do you need supporting sentences in the body of illustration paragraph

Is humanitarian an abstract noun

➡️
See all cards
4.14
7 Reviews
More study guides
3.69
16 Reviews

4.0
3 Reviews
Search results