answersLogoWhite

0

AllQ&AStudy Guides
Best answer

According to ASME Y14.5, a primary dimensioning datum requires at least 3 points of contact to establish the datum plane. Two points of contact are required for the secondary datum and 1 point of contact is required for the tertiary datum.

This answer is:
Related answers

According to ASME Y14.5, a primary dimensioning datum requires at least 3 points of contact to establish the datum plane. Two points of contact are required for the secondary datum and 1 point of contact is required for the tertiary datum.

View page

Datum is not the plural of data. Datum is singular, and its plural form is data.

View page

Datum and gps

View page

Correction: What is hydrographic datum? not "hydrography"

View page

1. Question is really vague, it is important to mark out the selected datum, as you just selected that datum? What else are you going to do with It? If you are working from another datum point just ensure that it is a good datum with critical measurements checked otherwise the new datum could throw out al measurements.

P.s i wish the selected retards would stop answering with nonsense answers.

View page
Featured study guide

What part did Donald Trump's success can be attributed to his parents

What is 8

What is the circumference of radius equals 18 inches

Solve for x and y 37x 43y 123 43x 37y 117

➡️
See all cards
3.0
2 Reviews
More study guides
4.19
27 Reviews

3.0
2 Reviews
Search results