answersLogoWhite

0

AllQ&AStudy Guides
Best answer

1. unit testing,integration testing, system testing, user acceptance testing.

2. unit testing, system testing , integration testing,user acceptance testing.

3. unit testing, system testing , user acceptance testing,integration testing.

4. unit testing, ,integration testing, user acceptance testing,system testing.

This answer is:
Related answers

1. unit testing,integration testing, system testing, user acceptance testing.

2. unit testing, system testing , integration testing,user acceptance testing.

3. unit testing, system testing , user acceptance testing,integration testing.

4. unit testing, ,integration testing, user acceptance testing,system testing.

View page

another name for unit testing

View page

These are the next testing levels after unit testing:

1 Integration testing

2 Component interface testing

3 System testing

4 Operational Acceptance testing

View page

Unit testing can be done during the development of an application.

The objective of unit testing is to isolate a section of code and verify its correctness. In procedural programming a unit may be an individual function or procedure

The goal of unit testing is to isolate each part of the program and show that the individual parts are correct. Unit testing is usually performed by the developer.

View page

module testing

View page
Featured study guide
📓
See all Study Guides
✍️
Create a Study Guide
Search results