The Midland Main Line is a major railway line in the United Kingdom, part of the British railway system.
The 'Modern' line links London St. Pancras International to Sheffield station in northern England via Luton, Bedford, Kettering, Leicester, Derby, Nottingham and Chesterfield.
Historically the line has extended further north to Manchester in the north west, Leeds in the north east and trains through to both Glasgow and Edinburgh in Scotland. The straighter East Coast Main Line initially saw the demise of Midland trains to Leeds and ultimately Scotland due to the longer journey times. Later, electrification of the West Coast Main Line and the Beeching cuts, saw Manchester trains withdrawn from the Midland and transferred to the West Coast Main Line.
January 2009 saw the opening of a brand new station, East Midlands Parkway between Loughborough and Trent Junction, to act as a parkway station for the major East Midlands cities and serve East Midlands Airport.[1]
Express passenger services on the line are operated by East Midlands Trains. The section between St Pancras and Bedford is electrified and forms the northern half of the Thameslink suburban service (operated by First Capital Connect), which provides a through service from Bedford to Brighton.
The northern part of the route between Derby and Sheffield forms part of the Cross Country Route and is shared with CrossCountry. The route from Nottingham to Leeds via Barnsley and Sheffield is shared with Northern. TransPennine Express operate through Sheffield. East Midlands Local also operates regional and local services between Nottingham and Leicester / Derby / Sheffield / Manchester.
Contents |
History
The Midland Main Line was built in stages between the 1830s and the 1860s, as three lines which met at the Tri Junct Station in Derby.
First to arrive was the line built by the Birmingham and Derby Junction Railway from Hampton-in-Arden, Warwickshire (on the London and Birmingham Railway) to Derby, which opened on 12 August 1839.[2] This section is now known as the Cross-Country Route through Birmingham to Bristol.
This was followed on 1 July 1840 by the North Midland Railway, which ran from Derby to Leeds Hunslet Lane via Chesterfield, Swinton, Masborough, near Rotherham (from where the Sheffield and Rotherham Railway ran a branch to Sheffield Wicker Station), and Normanton. This avoided Sheffield, Barnsley, and Wakefield in order to reduce gradients.
On the same day the Midland Counties Railway, which ran from Derby and Nottingham to Leicester Campbell Street, was extended from Leicester to a temporary station on the northern outskirts of Rugby.[3] A few months later, the Rugby viaduct was finished and the Midland Counties Railway reached the London and Birmingham's Rugby Station. This cut 11 miles off the B&DJR route via Hampton-in-Arden.
When these three companies merged to form the Midland Railway on 10 May 1844,[4] the Midland did not have its own route to London, and relied upon a junction at Rugby with the London and Birmingham's line (which became part of the London and North Western Railway on 1 January 1846) to London Euston for access to the capital.
By the 1850s the junction at Rugby had become severely congested, and so the Midland Railway constructed a route from Leicester to Hitchin on the Great Northern Railway, via Bedford.[5] The line avoids Northampton, a medium town south of Leicester, instead going via Kettering and Wellingborough in the east of Northamptonshire. This line met with similar problems at Hitchin as the former alignment had at Rugby, so in 1868 a line was opened from Bedford via Luton to London St Pancras.[6]
The final stretch of what is considered to be the modern Midland Main Line was a short cut-off from Chesterfield through Sheffield, which opened in 1870.
Also part of the line as defined by Network Rail,[7] is the Erewash Valley Line, Leicester to Burton upon Trent Line, Oakham to Kettering Line and sections of the Nottingham to Lincoln Line (as far east as Newark) and Birmingham to Peterborough Line (between Nuneaton and Oakham).
Partly to appease the concerns and opposition of landowners along the route, in places some of it was built to avoid large estates and rural towns, and to reduce construction costs the railways followed natural contours, resulting in many curves and bends. This has also resulted in the MML passing through some of the hillier areas of the British mainland, such as Sharnbrook (where there is a 1 in 119 gradient from the south taking the line to 340 feet above sea level). This has left a legacy of lower maximum speeds on the line compared to the other main lines. The solution to similar problems on the West Coast Main Line has been the adoption of tilting trains, Class 390 Pendolino trains introduced by Virgin in 2003.
By 1983, the line had undergone electrification from Moorgate as far north as Bedford. The introduction of the High Speed Train (HST) in May 1983 following the Leicester area resignalling brought about an increase of the ruling linespeed on the fast lines from 90 mph to 110 mph.
Between 2001 and 2003 the section of the Midland Main Line between Derby and Sheffield was upgraded from 100 mph to 110 mph as part of Operation Princess, the Virgin Cross Country route upgrade.
Many plans have been drawn up only later to be dropped in a bid to improve speed and journey times, although more recently with investment easier to come by the line looks set to benefit from 125mph running on extended stretches, improved signalling, increased number of tracks and possible electrification further north.[8]
Accidents
- 1845/1882/1886/1887/1897/1916/1927 Penistone rail accidents
- 26 September 1860 Bull bridge accident; collision
- 2 September 1861 Kentish Town rail accident; bridge collapse
- 24 December 1910 Hawes Junction rail crash; signalman forgot about train
- 2 September 1913 Ais Gill rail accident; collision
- 3 December 1923 Nunnery Colliery
- 13 December 1926 Orgreave Paddy Mail accident
- 22 March 2005 Market Harborough rail accident
- 1 February 2008 Barrow upon Soar rail accident
Barrow upon Soar rail accident
On 1 February 2008, an East Midlands Connect Class 158 158856 working a service from Nottingham railway station to Norwich railway station was involved in an incident at Barrow upon Soar. The train hit a footbridge that was in its path, after a road vehicle had struck and damaged the bridge, causing the bridge to be foul of the running line. Six passengers were on board the service and the driver had to be cut free from his driving cab. The footbridge itself, of Midland Railway heritage, has since been replaced.[9]
Operators
The principal operator is East Midlands Trains, which replaced Midland Mainline on 11 November 2007. Other operators include:
- First Capital Connect between London and Bedford;
- Eurostar at St Pancras International;
- London Midland in the Bedford area;
- First TransPennine Express in the Sheffield area;
- CrossCountry in the Leicester area and between Derby and Sheffield;
- Northern Rail between Nottingham and Sheffield.
Route definition and description
The cities, towns and villages served by the MML are listed below. Those in bold are served by the fast InterCity services. Be aware this section details the original line to Manchester (where it linked to the West Coast Main Line) and Carlisle (via Leeds where it meets with the 'modern' East Coast Main Line).
Network Rail group all lines in the East Midlands and the route north as far as Chesterfield and south to London as route 19. The actual line extends beyond this into routes 10 and 11.
London to Trent Junction
- London St Pancras
- Camden Road Tunnel
- Kentish Town
- Hampstead Tunnel
- Lismore Circus Tunnel
- Belsize Tunnel
- West Hampstead
- Cricklewood
- Cricklewood Depot sidings
- Hendon
- Mill Hill Broadway
- Elstree Tunnel
- Elstree & Borehamwood
- Radlett
- St Albans City
- Harpenden
- Luton Airport Parkway
- Luton Midland Road
- Leagrave
- Harlington
- Flitwick
- Ampthill Tunnel
- Bedford station junction for Marston Vale Line to Blechley.
- Bedford Midland
- (First Capital Connect services and electrification end here)
- Sharnbrook Tunnel (slow line only)
- Wellingborough Midland Road (Peak times only, at other times semi-fast trains serve).
- Kettering (Peak times only, at other times semi-fast trains serve).
- Kettering North Junction: formerly services to Corby and Melton Mowbray along the Oakham to Kettering Line.
- Market Harborough (One fast train per hour and one semi-fast per hour).
- Wigston South Junction for Birmingham to Leicester Line
- Knighton Junction for Leicester and Swannington Railway
- Knighton Tunnel
- Leicester London Road
- Syston
- Syston Junction for Leicester to Peterborough Line
- Sileby
- Barrow-upon-Soar
- Loughborough South Junction for non Network Rail line to Ruddington
- Loughborough Midland (One fast train per hour and one semi-fast per hour).
- East Midlands Parkway
- Red Hill Tunnel
-
- At Trent South Junction, the line splits into three, with lines to Derby, Nottingham and Erewash Valley
Trent Junction to Clay Cross Junction via Derby
-
- Sheet Stores Junction
- Long Eaton
- Spondon
- London Road Junction for Derby to Birmingham line
- Derby
- Duffield
- Belper
- Toadmoor Tunnel
- Wingfield Tunnel
Ambergate Junction to Manchester
For marketing and franchising, this is no longer considered part of the Midland Main Line: see Manchester, Buxton, Matlock and Midlands Junction Railway
The line was once the Midland Railway's route from London St Pancras to Manchester, branching at Ambergate Junction along the Manchester, Buxton, Matlock and Midlands Junction Railway, now known as the Derwent Valley Line. In days gone by, it featured named expresses such as The Palatine. Much later in the twentieth century, it carried the Midland Pullman.
- Ambergate
- Whatstandwell
- Whatstandwell Tunnel
- Lea Wood Tunnel
- Cromford
- Willersley Tunnel
- Matlock Bath
- High Tor No.1 Tunnel
- High Tor No.1A Tunnel
- High Tor No.2 Tunnel
- Holt Lane Tunnel
- Matlock
- Darley
- Rowsley
- Bakewell
- Hassop
- Longstone
- Monsal Dale
- Millers Dale
- (Blackwell Mill)
- (Buxton)
- Peak Forest
- Chapel-en-le-Frith
- Chinley
- Bugsworth
- New Mills
- Strines
- Marple
- Romiley
- Bredbury
- Brinnington
- Reddish North
- Ryder Brow
- Belle Vue
- Stockport (Teviot Dale)
- Manchester Central
This line was closed in the 1960s between Matlock and Buxton, severing an important link between Manchester and the East Midlands, which has never been satisfactorily replaced by any mode of transport. A section of the route remains in the hands of the Peak Rail preservation group, operating between Matlock and Rowsley to the north.
Trent Junction to Clay Cross Junction via Erewash Valley Line
-
- Trent East Junction
- Toton Centre
- Trowell Junction
- Langley Mill
- Alfreton Tunnel
- Alfreton
Trent Junction to Nottingham
-
- Trowell Junction
- Attenborough
- Beeston
- Nottingham
- Northbound trains often reverse at Nottingham, then join the Erewash Valley Line at Trowell Junction
Clay Cross Junction to Leeds
Leeds to Carlisle
For marketing and franchising, this is no longer considered part of the Midland Main Line: see Settle-Carlisle Railway.
World War I prevented the Midland Railway from finishing its direct route through the West Riding to join the Settle and Carlisle (which would have cut six miles from the journey and avoided the need for reversal at Leeds).
The first part of the Midlands West Riding extension from the main line at Royston (Yorks.) to Dewsbury was opened before the war. However the second part of the extension was not completed. This involved a viaduct at Dewsbury over the River Calder, a tunnel under Dewsbury Moor and a new approach railway into Bradford from the south at a lower level than the existing railway (a good part of which was to be in tunnel) leading into Bradford Midland (or Bradford Forster Square) station.
The 500 yard gap between the stations at Bradford continues to exist - closing it today would also need to take into account the different levels between the two Bradford stations, a task made easier in the days of electric rather than steam traction, allowing for steeper gradients than possible at the time of the Midland's proposed extension.
Two impressive viaducts remain on the completed part of the line between Royston Junction and Dewsbury as a testament to the Midland's ambition to complete a third direct Anglo-Scottish route. The line served two goods stations and provided a route for occasional express passenger trains before its eventual closure in 1968.
The failure to complete this section ended the Midland's hopes of being a serious competitor on routes to Scotland and finally put beyond all doubt that Leeds, not Bradford, would be the West Riding's principal town. Midland trains to Scotland therefore continued to call at Leeds before travelling along the Aire Valley to the Settle and Carlisle. From Carlisle they then travelled onwards via either the Glasgow and South Western or Waverley route. In days gone by the line enjoyed named expresses such as the Thames-Clyde Express and The Waverley.
- Leeds along the Airedale Line
- Here is Apperley Junction for the Wharfedale line
- Shipley: here is the triangular junction for the branch line serving Bradford
- Saltaire
- Bingley
- Crossflatts
- Keighley
- Here is the Worth Valley Branch junction to Oxenhope.
- Steeton & Silsden
- Cononley
- Skipton
- Here is Settle Junction for the line to Morecambe
- Giggleswick
- Clapham
- Here was the junction for Ingleton and an end-on junction via Sedbergh to Low Gill on the London and North Western Railway (LNW) West Coast Main Line
- Bentham
- Lancaster Green Ayre
- At this point the line divided: a triangular junction for the two lines:
- Morecambe
- Heysham Harbour, including a station for Middleton Road Heysham
- At this point the line divided: a triangular junction for the two lines:
- Here is Settle Junction for the line to Morecambe
- Settle
- Horton-in-Ribblesdale
- Ribblehead
- Dent
- Garsdale
- At Hawes station, on the branch to the east of the main line, there was an end-on junction with the North Eastern Railway (NER) line across the Pennines to Northallerton
- Kirkby Stephen
- Appleby
- Langwathby
- Armathwaite
- Cumwhinton
- Carlisle
Former stations
As with most railway lines in Britain, the route used to serve far more stations than it currently does (and consequently passes close to settlements that it no longer serves). Places that the current mainline used to serve include
- London to Leicester
- Camden Road
- Haverstock Hill
- Finchley Road
- Welsh Harp
- Napsbury
- Chiltern Green
- Ampthill
- Oakley
- Sharnbrook
- Irchester
- Finedon
- Isham and Burton Latimer
- Rushton
- Desborough
- East Langton
- Kibworth
- Great Glen
- Wigston Magna
- Leicester to Trent Junction
- Leicester Humberstone Road
- Cossington Gate
- Hathern
- Kegworth
- Trent
- Derwent Valley
- Breaston (later Sawley - see Long Eaton)
- Draycott
- Borrowash
- Derby Nottingham Road
- Wingfield
- Stretton
- Clay Cross
- Erewash Valley
- Long Eaton (Original Midland Counties Railway station not the present one)
- Stapleford and Sandiacre
- Stanton Gate
- Trowell
- Ilkeston and Cossal
- Shipley Gate
- Codnor Park and Ironville
- Pye Bridge
- Westhouses and Blackwell
- Doe Hill
- Chesterfield to Leeds
- Staveley
- Eckington
- Killamarsh
- Beighton
- Woodhouse Mill
- Treeton
- Sheepbridge
- Unstone
- Beauchief
- Millhouses
- Heeley
- Attercliffe Road
- Brightside
- Holmes
- Rotherham Masborough
- Parkgate and Rawmarsh
- Kilnhurst
- Swinton West (reopened Swinton)
The following on the original North Midland Railway line
Future
Traffic levels on the Midland Main Line are rising faster than national average, with continued increases predicted. The now defunct Strategic Rail Authority produced a Route Utilisation Strategy for the Midland Main Line in 2006 to propose ways of meeting this demand[10] ; Network Rail started work on a new study in February 2008 and is expected to be finalised early in 2010.[11]
Network Rail's plans
The Midland Main line has for many years been thought of as a 'Cinderella' line and, with the increasing capacity constraints on other lines, the route looks set to benefit from investment and enhancement. Plans for the line include:
- Re-signalling of the entire route, which is expected to be complete by 2016 when all signalling will be controlled by the East Midlands Signalling centre in Derby.[12]
- Rebuilding Derby station[13]
- Rebuilding Leicester station which would also involve an enhanced approach layout during re-signalling works[14]
- Rebuilding Bedford station
- Accessibility enhancements at Loughborough station[15]
- Accessibility enhancements at Luton station[16]
- Renewing Trent and Clay Cross Junctions.[17]
- New bi-directional line between Kettering and Wellingborough.[18]
- Upgraded approach signalling to junctions allowing trains to cross over at higher speeds.
- Thameslink Programme (see below)
- Straightening the line at Market Harborough
- Electrification [19]
- Speeds up to 125 mph (2013 onwards)
- Possible Rushden Parkway station could be built on the former Irchester railway station
Route Utilisation Strategy
Thameslink Programme
2007 business plan
Network Rail's 2007 business plan for the Midland Main Line [22] talks for the first time in recent years of line speed increases - bringing journey times to Sheffield to under two hours, meaning that journey times would become more competitive to other north-south routes. Highlights include:
- Kettering south - Harowden Junction (Wellingborough) third bi-directional slow line
- Syston - Trent south slow line linespeed increases
- Erewash Valley line resignalling (ongoing)
- Removal of Clay Cross Junction (2008), new high speed Junction created south of Chesterfield (May 2008)
- Trent Junction resignalling (April 2009 - January 2010)
- Bedford & Nottingham stations remodelling
- Flashing yellow signal aspects added at key junctions - Radlett, Harpenden and Leagrave
Freight utilisation strategy
Network Rail published a Route Utilisation Strategy for freight in 2007,[23] over the coming years a cross country freight route will be developed enhancing the Birmingham to Peterborough Line, increasing the lines through Leicester, and remodelling Syston and Wigston Junctions.
|
|||||||||||
|
||||||||||||||||||||
|
||||||||||||||
References
- ^ "EAST MIDLANDS PARKWAY - OUR GREENEST STATION TO OPEN ON 26 JANUARY=14 January 2009". East Midlands Trains. http://www.eastmidlandstrains.co.uk/EMTrains/AboutUs/News/_EASTMIDLANDS’GREENESTSTATIONTOOPENON26JANUARY_.htm.
- ^ "Birmingham and Derby Railway=9 March 2008". spartacus.schoolnet.co.uk. http://www.spartacus.schoolnet.co.uk/RAderby.htm.
- ^ "Midland Counties Railway=March 09, 2008". spartacus.schoolnet.co.uk. http://www.spartacus.schoolnet.co.uk/RAcounties.htm.
- ^ "Midland Railway=9 March 2008". spartacus.schoolnet.co.uk. http://www.spartacus.schoolnet.co.uk/RAmidland.htm.
- ^ "A Midland Railway chronology>Incorporation and expansion=1998". The Midland Railway Society.. http://www.mimas.ac.uk/~zzaascs/mrsoc/chron.html.
- ^ "A Midland Railway chronology>London extension=1998". The Midland Railway Society.. http://www.mimas.ac.uk/~zzaascs/mrsoc/chron.html.
- ^ Route 19 Midland Main Line and East Midlands http://www.networkrail.co.uk/browse%20documents/StrategicBusinessPlan/R19%20-%20MML.pdf
- ^ http://www.transportbriefing.co.uk/news/story?id=6012
- ^ Train Driver Critically Injured After Lorry Smashes Into Bridge |Sky News|UK News
- ^ "Midland Main Line / East Midlands > Route Utilisation Strategy". Strategic Rail Authority. http://www.dft.gov.uk/consultations/archive/2003/midlandmainlineeastmidlandsr1350. Retrieved 2008-08-29.
- ^ "East Midlands". Network Rail. http://www.networkrail.co.uk/browseDirectory.aspx?dir=\RUS%20Documents\Route%20Utilisation%20Strategies\East%20Midlands&pageid=4449&root=\RUS%20Documents\Route%20Utilisation%20Strategies. Retrieved 2008-08-29.
- ^ "SECRETARY OF STATE OPENS NETWORK RAIL CONTROL CENTRE". Network Rail. http://www.networkrailmediacentre.co.uk/Content/Detail.asp?ReleaseID=3654&NewsAreaID=2&SearchCategoryID=6. Retrieved 2008-08-29.
- ^ "NETWORK RAIL INVESTS £18M TO REBUILD DERBY STATION". Network Rail. http://www.networkrailmediacentre.co.uk/Content/Detail.asp?ReleaseID=3432&NewsAreaID=2&SearchCategoryID=6. Retrieved 2008-08-29.
- ^ "Plans for £150m station facelift". 2008-03-06. http://news.bbc.co.uk/1/hi/england/leicestershire/7280724.stm.
- ^ "Access for All > Network Rail is managing a 10-year programme of station accessibility enhancements under the Government’s nation-wide Railways for All Strategy.". Network Rail. http://www.networkrail.co.uk/aspx/4075.aspx. Retrieved 2008-08-29.
- ^ "Access for All > Network Rail is managing a 10-year programme of station accessibility enhancements under the Government’s nation-wide Railways for All Strategy.". Network Rail. http://www.networkrail.co.uk/aspx/4075.aspx. Retrieved 2008-08-29.
- ^ "PASSENGER REMINDER - RENEWING THE RAILWAY IN THE EAST MIDLANDS THIS SUMMER". Network Rail. http://www.networkrailmediacentre.co.uk/Content/Detail.asp?ReleaseID=3081&NewsAreaID=2&SearchCategoryID=6. Retrieved 2008-08-29.
- ^ "£11.5 MILLION BOOST FOR MIDLANDS’ COMMUTERS". Network Rail. http://www.networkrailmediacentre.co.uk/Content/Detail.asp?ReleaseID=4178&NewsAreaID=2&SearchCategoryID=6. Retrieved 2009-02-19.
- ^ "Working Group 4 – Electrification Strategy". Network Rail. http://www.networkrail.co.uk/browseDirectory.aspx?dir=\RUS%20Documents\Route%20Utilisation%20Strategies\Network\Working%20Group%204%20–%20Electrification%20Strategy&pageid=4449&root=\RUS%20Documents\Route%20Utilisation%20Strategies. Retrieved 2009-09-27.
- ^ "Thamslink Programme > News". http://www.networkrail.co.uk/aspx/1326.aspx.
- ^ "Thameslink Programme > Network Rail". http://www.networkrailmediacentre.co.uk/Content/Detail.asp?ReleaseID=3208&NewsAreaID=17&SearchCategoryID=-1.
- ^ "Business Plan 2007 > Route 19 > Midland Main Line & East Midlands". http://www.networkrail.co.uk/aspx/3085.aspx.
- ^ "Route Utilisation Strategy > Freight". http://www.networkrail.co.uk/browseDirectory.aspx?dir=\RUS%20Documents\Route%20Utilisation%20Strategies\Freight&pageid=2895&root=.
This entry is from Wikipedia, the leading user-contributed encyclopedia. It may not have been reviewed by professional editors (see full disclaimer)