Results for Missouri River basin project
On this page:
 
 
Columbia Encyclopedia: Missouri River basin project,
comprehensive plan authorized in 1944 for the coordinated development of water resources of the Missouri River and its tributaries, draining an area of c.513,300 sq mi (1,329,400 sq km) in Nebraska, Montana, South Dakota, North Dakota, Wyoming, Kansas, Missouri, Colorado, Iowa, and Minnesota. The program provided for the construction of 112 dams with a storage capacity of almost 35 million gal/132 million liters; 4,300,000 acres (1,740,000 hectares) of irrigated land; 2.6 million kilowatts of hydroelectric generating capacity; a 9-ft (2.7-m) navigable channel on the Missouri River from Sioux City to its mouth; control of floods and sedimentation; protection of fish and wildlife; and development of recreational facilities and industrial and municipal water supplies. Seven main-stem dams on the Missouri were completed (Fort Peck, Garrison, Oahe, Big Bend, Fort Randall, Gavins Point, and Canyon Ferry), and 80 other dams were built on tributaries. The program has been modified and expanded over the years and is integrated with other projects for the region, including the Colorado–Big Thompson project, the Shoshone project, and the North Platte project. Although the project created a navigation channel on the lower Missouri, the fish and wildlife there were greatly reduced.


 
 
Wikipedia: Pick-Sloan Missouri Basin Program
Pick-Sloan Plan for Missouri River Basin, 1992.
Enlarge
Pick-Sloan Plan for Missouri River Basin, 1992.

The Pick-Sloan Missouri Basin Program, formerly called the Missouri River Basin Project, was initially authorized by the Flood Control Act of 1944, which approved the general comprehensive plan for the conservation, control, and use of water resources in the entire Missouri River Basin.

The intended beneficial uses of these water resources include flood control, aids to navigation, irrigation, supplemental water supply, power generation, municipal and industrial water supplies, stream-pollution abatement, sediment control, preservation and enhancement of fish and wildlife, and creation of recreation opportunities.

It derives its name from the authors of the program -- Lewis A. Pick, director of the Missouri River office of the United States Army Corps of Engineers and William Glenn Sloan, director of the Billings, Montana office of the United States Bureau of Reclamation.


References

See also


 
 

Join the WikiAnswers Q&A community. Post a question or answer questions about "Missouri River basin project" at WikiAnswers.

 

Copyrights:

Columbia Encyclopedia. The Columbia Electronic Encyclopedia, Sixth Edition Copyright © 2003, Columbia University Press. Licensed from Columbia University Press. All rights reserved. www.cc.columbia.edu/cu/cup/  Read more
Wikipedia. This article is licensed under the GNU Free Documentation License. It uses material from the Wikipedia article "Pick-Sloan Missouri Basin Program" Read more

Search for answers directly from your browser with the FREE Answers.com Toolbar!  
Click here to download now. 

Get Answers your way! Check out all our free tools and products.

On this page:   E-mail   print Print  Link  

 

Keep Reading

Mentioned In: