answersLogoWhite

0

AllQ&AStudy Guides
Best answer

The present bridge is a pre-stressed concrete box girder bridge.

This answer is:
Related answers

The present bridge is a pre-stressed concrete box girder bridge.

View page

The present London Bridge is built using pre-stressed concrete.

View page

London Bridge is a pre-stressed concrete box girder bridge.

View page

The current London Bridge is a pre-stressed concrete box girder bridge.

View page

The present London Bridge is a pre-stressed concrete box girder bridge.

View page
Featured study guide

The Moon

13 cards

What is the conjunction in the sentence Cathy won not only a blue ribbon but also took home the champion trophy

Which constellation is home to the Lagoon Nebula

What was the first successful flyby satellite launch to the Moon

Which of these is considered one of the oldest texts regarding astronomy

➡️
See all cards
No Reviews
More study guides
No Reviews

No Reviews
Search results