Yuanshi Heavy Industry has launched a Scrap Crushing Production Line. After knowing the precautions for use, have you noticed the precautions before using the waste crushing production line? Yuanshi Heavy Industry is a professional crushing equipment manufacturer, providing various types of metal crushers. The precautions before using the machine let us know at a glance.

①The equipment of metal crusher should be installed and fixed. The fixation of metal crusher should be fixed on the basis of cement. If the work site needs to be changed frequently, the crusher and motor equipment should be fixed on the base with angle irons to avoid damage to the metal crusher during movement.

②It is necessary to do a start-up inspection of the metal crusher. If the crusher is powered by a diesel engine, the power of the two should match. Before starting, make sure that the connection bolts of each part of the unit are tightened, whether the transmission belt is tight, whether the power cord is normal, whether the motor shaft and crusher shaft Parallel, check whether the blade and sieve are normal.

③ Production operation requirements during the work of the metal crusher. It is necessary to pay attention to the working condition of the crusher at any time during the work, and the feed is uniform to prevent clogging, and it is prohibited to run for a long time with overload. If there is vibration, noise or the temperature of the crusher is too high, you need to stop and check it immediately.

④Crushed materials should be carefully checked, and no foreign objects such as stones and metals should be mixed to avoid damage to the equipment. The work of the machine is that the operator must not separate the equipment, nor can he disassemble the machine to check the operation status of the crusher while the machine is running. When feeding, the operator should stand next to the crusher to prevent accidental injury from rebound debris. Do not stop the machine immediately after the crusher is finished. Let the equipment continue to run for 2-3 minutes to allow all materials to be discharged intact.

User Avatar

Fang Mia

Lvl 5
5y ago

What else can I help you with?

Related Questions

What safety precautions should be taken when using radioactive substances?

you need to stay about 3-4 feet away from the substance.


What are 4 precautions that should be followed in your PE class?

There are no precautions. HA HA HA


Do you know the traits of the impact crusher?

There are about four traits of the impact crusher. 1.Wide range usage 2.Various function 3.Durability 4.Easy maintenance But if you want to know more information about it, i just advice you to come to the Shanghai Jianshe Luqiao Machinery Co Ltd--professional impact crusher suppliers for you. They also do some impact crusher wholesale and other concerned service. You can also search it in google. Or contact the it directly. Email:inquiry@shanbao.com.cn Tel:+86-21-51393838 Hope this can help you.


After using micropur mp1 how long should you allow before drinking the water?

After using micropur how long should you allow to drink contaminated water?


How long should you allow before drinking contaminated water after using micropur?

4 hours


What are the precautions associated with using senna?

Not to be taken by those with an intestinal obstruction, stomach inflammation, intestinal inflammatory diseases, children, pregnant or lactating women. Not to be used longer than 2 to 4 weeks. And more . . .


What are the safety considerations when using 4-4-4-4 aluminum wire for electrical installations?

When using 4-4-4-4 aluminum wire for electrical installations, it is important to consider safety precautions such as proper insulation, secure connections, and following manufacturer guidelines. Aluminum wire can be more prone to overheating and corrosion compared to copper wire, so it is crucial to use the appropriate connectors and techniques to prevent these issues. Additionally, regular inspections and maintenance are recommended to ensure the safety and efficiency of the electrical system.


Who are the 5 super villains in super power island?

1.Copy Cat 2. Speeding Spike 3. Sir Rebral 4. Ratman 5. Crusher


How long should you wait before drinking water after using the micropur mp1 tablet?

4 hours


How long should you allow before drinking the contaminated water using Micropur tablets?

4 hours


How long should you allow before drinking contaminated water after using micropur MP1?

4 hours


How many Tons of crusher run for pad 24 feet by 26 feet by 8 inches thick?

well 18 tons will do a pad 20X20 4 inches thick... which is almost 1/2 a ton per square foot at 4 inches thick. so 1 ton per 8 inches thick per square foot. so I would say around 42 tons of crusher for your pad.