That's going to depend on pretty nearly all of the following details:
-- length of the front yard
-- width of the front yard
-- 3 cubic yards of WHAT ?
-- how deep it has to be
About 1.307 cubic yards are in one cubic meter.
Divide cubic feet by 27 to get cubic yards.
9 yards * 7 yards * 11 yards = 63 square yards * 11 yards = 693 cubic yards, which is about 530 cubic meters.
Stone can be measured in tons or yards. Actually yards refers to cubic yards. A cubic yard measures one yard by one yard by one yard (in feet, 3 x 3 x 3). When stone is in a pile, try to estimate the volume in cubic feet, then divide by 27 to get cubic yards.
If 1 cubic yard = 27 cubic feet, then 4 cubic yards = 108 cubic feet.
The mattress would have a total area of roughly 1.04 cubic yards. However, a cubic yard is one yard long by one yard wide by one yard deep. The mattress is only 8 inches deep, not enough to equal a yard, so it really does not have any one area that is a cubic yard in size.
1 cubic yard = 27 cubic feet 1 cubic foot = 0.037 cubic yard (rounded)
If you mean cubic yards, multiply by 27. 3 X 27 = 81. Concrete is sold the yard, but that really means cubic yards.
There are no yards in any number of cubic feet.However, 1 cubic yard = 27 cubic feet
A cubic yard is bigger than a cubic foot. There are 27 cubic feet in a cubic yard.
There are 0.764555 meters in one cubic yard. To convert cubic yards to meters, you can multiply the number of cubic yards by this conversion factor: 26.94 cubic yards * 0.764555 meters/cubic yard ≈ 20.61 meters So, 26.94 cubic yards is approximately equal to 20.61 meters.
The meter is a bit more than a yard, so a cubic meter will have a bit more than a cubic yard in it. The cubic meter is actually about 1.30795 cubic yards, so since we're just doing a "ball park" estimate, our guess that a cubic meter is about the same as a cubic yard is only off a bit. A cubic meter is about 1.3 cubic yards if you wish to get a bit more specific.