answersLogoWhite

0

It depends on what you mean by 'converter'; I'm not aware of such a machine.

<<>>

No, a 4 kW rotophase will not handle the start up current of a 4 kW 3 phase motor.

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

What phase would gallium be at 37 celsius?

At 37 degrees Celsius, gallium would be in its liquid phase, as its melting point is 29.76 degrees Celsius.


Translate the phase to an algebraic expression Justin had 37 before spending q dollars on jeans How much money remains?

$(37 - q )


Which size cable use for 37 kw induction motor?

For a 37 kW induction motor, a cable size of approximately 10 AWG (American Wire Gauge) would be suitable for typical installations. However, the specific cable size required would depend on factors such as the length of the cable run, ambient temperature, and voltage drop considerations. It is recommended to consult with a qualified electrician to determine the appropriate cable size for your specific application.


What engine fits in a Mitsubishi Mirage 1983?

well aside from the 4g10 and 4g32/33/37 engines...the motor from the cordia turbo fits and so does the beloved 4g63bt.... evo motor...although that one requires a bit of work well aside from the 4g10 and 4g32/33/37 engines...the motor from the cordia turbo fits and so does the beloved 4g63bt.... evo motor...although that one requires a bit of work


What has the author D H Trevena written?

D. H. Trevena has written: 'The Liquid Phase (Wykeham Science Series Nol 37)'


How do you wire a stone cutting machinethat requires a voltage of 380motor power 7.5kwstarting amps 30-37 and running amps of 15?

It sounds like you're describing a 3 phase system. You really need an electrician to help you. If nothing else, you'll need to bring 3 phase power to your shop to run the machine. There is always the possibility of changing the motor of your stone cutting machine and try to find something that will run 240 V single phase if that's what you already have. 380 volts at 50hz would be compatible with 460 volts at 60 hz, number 12 copper wire with a 40 amp breaker for starting. On 60 hz system the motor rpm will be a little higher.


What fuse number is the ac blower motor on a 95 ford contour?

#37 (30A) in the passenger compartment (not under the hood)


Which configuration mode applies settings during the first system boot after the Windows installation or the audit mode phase?

oobeSystem (pg 37 last bullet)


What does concrete grade C 30-37 stands for?

Concrete grade C30/37 indicates a specific strength classification of concrete. The &quot;C&quot; stands for &quot;Concrete,&quot; while &quot;30&quot; refers to the characteristic compressive strength of 30 MPa (megapascals) when tested at 28 days, and &quot;37&quot; represents the cylinder strength of 37 MPa. This grading suggests it is suitable for structural applications where moderate strength is required.


How fast is jackal RC?

The Jackal RC is known for its impressive speed, reaching up to 60 km/h (approximately 37 mph) depending on the model and terrain. Its powerful motor and lightweight design contribute to its agility and quick acceleration, making it suitable for various off-road conditions. Overall, it's designed for high-performance racing and recreational use.


What is half of 74?

1/2 x 74 = 37


HOW MANY AMPS IS 37 KVA?

To convert kilovolt-amperes (kVA) to amperes (A), you can use the formula: Amps = kVA × 1000 / Voltage. Assuming a standard voltage of 400V (three-phase), 37 kVA would be approximately 53 amps. If the voltage is different, you would need to adjust the calculation accordingly.