min: 0.5 KVA MAX: 1.5 KVA
Yes, the KVA can demand for excess charges from msedcl for the industrial category.
If you are being billed for kVA or a percentage of kVA as opposed to kW then installing power factor correction equipment will reduce the kVA demand. To determine if this is cost effective is the challenge which I specialize in. Email me at mark@epowerfactor.com
35 KVA generator using for load 100 meter length which cable need to used
maximum demand is measured in kva because current drawn is dependent on power factor for the same load and current drawn is calculated with kva
Rs. 285 per kva
I=Kva*1000/v*1.732 =500*1000/415*1.732 =500,000/718.78 =695.62 Amps. So max.load of 500kva DG is 695.62 Amps
trivector meters are used to measure kVAh and also kVA of maximum demand.it has a kwh meter and reactive kvah meter in a case with special summator mounted between them.
1.two part tariff= maximum demand+energy consumption (150 kva + any greater than 150 kva consumption) 2.three part tariff=maximum demand+energy consumption+ any energy charge (150 kva + any greater than 150 kva consumption + out source any energy charge ) unlimited usage of tariff is nothing but three part tariff
maximum demand, energy, kva rating, and power factor
what should be height of stack of 1250 kva D.G as per Indian pollution boardA: it should be 7.1 meter + building height of 1250kva Dg set installed.
1.50 meter from the support is the max. safe length cantilever beam