Have you done my work asks generically if you've ever at some point in time done that work. It has no specific time of start or completion of the action. Ongoing action over nonspecific length of time. Have I done the homework (for instance) of my friend in the past? Yes, on numerous occasions with no specific dates in mind.
Did you do my work asks did I do it and finish it specifically at a definable time in the past. I did your work last night. I did your work last week on Saturday. I did it, it is now finished.
Algorithm is step wise analysis of the work to be done. Flow chart is a pictorial representation of an algorithm. As flow chart is a picture of work to be done,it may be printed in our mind when we observe it.
She enjoys doing 'spot the difference' puzzles.There is a difference between happy and sad.What is the difference between these two cakes?
An ALLEY is a--often dark--space between two buildings.An ALLY is someone you work with. (Synonyms: Friend, Accomplice, Teammate, etc.)
An assignment is something you're assigned to do, homework is work that you do at home so therefore a homework assignment is work that you're assigned to do at home.
the men have done a lot of work or the men will do a lot of work both of these work fine
What is difference between payment for honorarium
Work Output is the work done BY a machine. Work Input is the work done ON a machine.
potential difference is the amount of work done in moving a unit charge from one point to another point. potential difference be V ,work done be J and charge be C.V=J\C
If the angle between the displacement and force applied is less than a right angle, then it is Positive Work done. If the angle between the displacement and the force applied is greater than a right angle then it is Negative Work done. If the displacement and force are at right angles, or either is zero, then it is Zero Work done.
The difference between load and capaity is as follows:Load is the amount of work that MUST be done, amount of work scheduled ahead of a manufacturing facility.Capacity is the amount of work that CAN be done, and measures the highest output of work expressed as a rate with current product specifications, work force, plant, equipment etc.
motion is the movement of an object and force is the power or work done to move the object
Work done is putting work into a system the same asenergy i.e en-ergy = input ergy.Work out is exergy i.e ex ergy output ergy.
if only heat change is the only change then energy difference is the amount of work done.
Crew work together as a team to get the job done and staff do their individual jobs to get a larger job done..
saleens have work done to them. and have more hp and are rare
how is conventional brick bat coba work done
There is really no difference.