MCE =value added time (process time)/throughput time. Basically this breaks down to the time spent actually working on the product divided by the time spent working on the product, time spent on inspecting the product, time spent on moving the product and time a product spend waiting to be worked on.
scottish scottish
You suck at leet.
890456724801564785612405601271505710
enough
Confu$ed?
600 g = 21.16 oz
50 or so
H0w 4r3 y0u g01ng
A single number does not have a range so you cannot find it.
I think you could boil pig trotters as you do with the cow's hoofs.
OMG IDK GO LEARN H0W TO READ .. Joking it's Grateful <---
h0w much kost the traintickets ams ros