answer is something that nobowdy noerjhgfjkjare
The main difference between the C-SCAN and SCAN algorithms for disk scheduling is how they handle requests that are located at the end of the disk. C-SCAN moves the disk arm to the other end of the disk after servicing the last request, while SCAN moves the arm back to the beginning of the disk. This difference affects the order in which requests are serviced and can impact the overall efficiency of the disk scheduling algorithm.
Scheduling is necessary because a computer can only handle one task at a time.
The same way you handle most requests - calmly and graciously.
Your Answer: Handle routine logistics, such scheduling, budgeting and arranging for permits
concurrent server is a server which can handle multiple requests at a time.
Try to provide to their requests. All of this within reason, though.
MVT (Multi-Variable Task) job scheduling is a technique used in operating systems to manage and allocate resources for multiple tasks or processes efficiently. It allows the system to handle varying job sizes and types by dynamically partitioning memory and allocating CPU time based on priority and resource requirements. MVT enhances system responsiveness and throughput by optimizing the execution of jobs in a time-sharing environment. This scheduling method is particularly effective for systems that need to balance multiple user requests and applications simultaneously.
Servers are deigned to handle multiple connection requests. Depending on the service, for each request a socket or thread is opened.
Unix was designed specifically to handle many users and requests at the same time (time-sharing).
Daemon
front controller
to prevent the target server from being able to handle additional requests