You can use the power factor correction to know if 1000kw is required in the kv capacitors.

User Avatar

Wiki User

11y ago

What else can I help you with?

Related Questions

Is a MW equal to 10000KW or 1000KW?

Mega = 10 000 so 10 000MW


How many watts is 1 mega watt?

1 mega watt is 1,000,000 watts


What is the dimension of a 100 kg 1000 kw wood gasifier?

100kg?1000kw?none can do it!I can make the dimension of a 100 kg 10kw wood gasifier.


How would you know if a catalytic converter is required on a vehicle?

If it was built with one, it is required.


What is required in a butcher job?

It is required that you know how to use a knife. You should also know the different bones and joints of animals so you know how to cut different types of meat.


Do let me know if any further details is required?

The correct sentence would be "Please let me know if any further details are required."


What substance is not required for coagulation?

I do not know you are stupid


How many lights are required on a boat st night?

well i know in oklahoma the required amount is three.


What jobs are required to know logarithms?

who the hell cares


How much space is need for 1 MW solar inverter?

There are various factors that we need to consider while setting up a solar power plant. A solar company can give you accurate estimation of land and all other things required to set up 1 MW solar power plant.So let's do some calculations on the area required for 1 MW solar panels only:1MW = 1000kW = 1000000WIF 250 W solar panels are used -THEN no of solar panels = 1000000W/250 =4000 panels1 250 W solar panel requires 1.6 SqM of land area,So1.6 SqM * 4000 = 6400 SqMThis is the area required for solar panels. Again you'll have to to add extra space to avoid shadowing on solar panels.So technology wise, the land required for a 1 MW power plant setup is around 4.5-5 acres for Crystalline technology and around 6.5-7.5 acres for Thin-Film technologyNow coming back to you question - 1 60kW solar inverter requires around 1.08 SqM area. So,1000kW/60kW = 17 Inverters17 X 1.08 SqM = 18.38 SqMSo around 20 SqM space is required for 1 MW solar inverter.


How to know balance in GPF account?

G.P.F.Account Balance Required.


What are the release dates for The Doctors - 2008 How to Know When Surgery Is REQUIRED 4-154?

The Doctors - 2008 How to Know When Surgery Is REQUIRED 4-154 was released on: USA: 23 May 2012