In the service distribution panel there are termination points at the top of the panel. Two of the utilities "hot" conductors terminate on the main breaker. The neutral utility termination point is on a terminal block usually off to the side near the main hot terminations. It is in this neutral termination block where the system ground connects from the ground rods to the distribution panel. For a 100 amp panel the wire size will be a #6 bare copper conductor.
If what you state in this question is accurate this is an illegal installation. A 100 amp service can not have any equipment connected to it less that that of the service size. The 60 amp main panel must be a 100 amp panel to be a legal installation.
#8 is the size of wire to use for grounding a 100 Amp panel. Green is color used for grounding #8 is code.
20Sqmm
Yes, but at every reduction in wire size there has to be a breaker sized to the smaller wire size. The wire size for 100 amp panels is recommended at #3 copper conductor. From the 200 amp feeder panel you will require a 100 amp two pole breaker for each of the two 100 amp services. Keep in mind that if you run the 100 amp services close to maximum this will take away the capacity of the 200 amp service for other branch circuits coming off of it. Also keep in mind that if the panels are located, not in the same building as the 200 amp service that the 100 amp panels will be treated as separate services and will have to be constructed like a 100 amp service. This includes ground rods. Also the bonding screw will have to be removed that connects the neutral buss to the panel enclosure.
Ground the meter base only if it's a duplex. Otherwise, ground at the main switch or panel.
If what you state in this question is accurate this is an illegal installation. A 100 amp service can not have any equipment connected to it less that that of the service size. The 60 amp main panel must be a 100 amp panel to be a legal installation.
#8 is the size of wire to use for grounding a 100 Amp panel. Green is color used for grounding #8 is code.
20Sqmm
Yes, but at every reduction in wire size there has to be a breaker sized to the smaller wire size. The wire size for 100 amp panels is recommended at #3 copper conductor. From the 200 amp feeder panel you will require a 100 amp two pole breaker for each of the two 100 amp services. Keep in mind that if you run the 100 amp services close to maximum this will take away the capacity of the 200 amp service for other branch circuits coming off of it. Also keep in mind that if the panels are located, not in the same building as the 200 amp service that the 100 amp panels will be treated as separate services and will have to be constructed like a 100 amp service. This includes ground rods. Also the bonding screw will have to be removed that connects the neutral buss to the panel enclosure.
Ground the meter base only if it's a duplex. Otherwise, ground at the main switch or panel.
A 200 amp service panel will require a # 4 bare copper ground wire.
A 100 amp service will supply your electrical current needs UP TO 100 amps.When doing load calculations on a 100 amp panel it can only be loaded up to 80 amps.
How do i install aluminum bonding strap in sub panel of 100 amp service
A 100 amp residential service requires a size #8 copper wire, it should be insulated in green.
On a 200 amp or any size service the ground wire is easily identified. Look in the distribution panel for the neutral bus bar. This is where the service neutral (white wire) is connected to the distribution panel. There you will see a bare copper wire connected to the same neutral bar. This is the ground wire that is connected to the ground rods out side of the house.
It is not in parallel. You put a breaker in existing panel and use that to feed the subpanel. The Amperage of this subfeed breaker should match the rating of the new panel. For example a 100A breaker might be typical. Remember that ground and neutral are only "bonded" at the main panel. Usually a subpanel has a means to separate the neutral and ground in a subpanel. Be careful since everything about doing this is dangerous.Another AnswerYes, you can have two breaker panels in parallel. If you had a 100 amp panel on a 200 amp service (or increase the size of the service, check with your power company on the size of your service, you could add a second 100 amp panel in parallel with the first. You can have up to 6 disconnects per service, but they must be located adjacent to each other or in the same enclosure. So either install the second panel beside the first or a 100 amp disconnect beside the first panel and feed out of the disconnect to the new panel located where you need it.
You should not load a 125 amp panel any more than 100 amps.