answersLogoWhite

0

It's because of the save format on Visual Boy Advanced. FireRed uses Flash 128k, where as VBA usually uses Flash 64K. To fix this click Options>Emulator>Save Type>Click Flash 128K. Then restart your rom.

Make sure to delete any old saves, since FireRed will still load the old save format.

What else can I help you with?

Related Questions

What is importance of circuit breakers in sub station?

the circuit board


How do you install the 1M circuit board into the visual boy advance?

to install it you go ouside and say hi to the world


How to install a sub panel in a residential electrical system?

To install a sub panel in a residential electrical system, follow these steps: Turn off the main power supply to the house. Choose a suitable location for the sub panel near the main panel. Install a new circuit breaker in the main panel to connect the sub panel. Run the necessary wires from the main panel to the sub panel. Connect the wires to the appropriate terminals in the sub panel. Install the circuit breakers in the sub panel for the circuits you want to power. Turn on the main power supply and test the sub panel to ensure it is working correctly.


What are the necessary steps for installing a Siemens sub panel in a residential electrical system?

To install a Siemens sub panel in a residential electrical system, follow these steps: Turn off the main power supply to the house. Choose a suitable location for the sub panel near the main panel. Install the sub panel by mounting it securely to the wall. Connect the sub panel to the main panel using appropriate wiring and conduit. Install circuit breakers in the sub panel for each circuit. Connect the circuits to the breakers in the sub panel. Test the sub panel to ensure it is functioning correctly. Turn on the main power supply and check that the sub panel is working properly.


How to install a 100 amp sub panel in a residential electrical system?

To install a 100 amp sub panel in a residential electrical system, follow these steps: Turn off the main power to the house. Choose a location for the sub panel near the main panel. Install a new circuit breaker in the main panel for the sub panel. Run wires from the main panel to the sub panel location. Connect the wires to the sub panel and main panel. Install the sub panel onto the wall. Connect the circuits from the main panel to the sub panel. Turn on the main power and test the sub panel.


Should you ever use filler mortar to install cement board over a gouged particle board sub floor?

Thinset or Speet set would be better


What are the necessary steps for installing a 30 amp sub panel in a residential electrical system?

To install a 30 amp sub panel in a residential electrical system, you need to first turn off the main power, install the sub panel near the main panel, connect the sub panel to the main panel with appropriate wiring, install the circuit breakers in the sub panel, and then connect the circuits to the sub panel. Finally, turn the power back on and test the sub panel to ensure it is working correctly.


What are the necessary steps to install a 100A sub panel in a residential electrical system?

To install a 100A sub panel in a residential electrical system, follow these steps: Turn off the main power supply to the house. Determine the location for the sub panel and mount it securely. Install a new circuit breaker in the main panel for the sub panel. Run appropriate gauge wires from the main panel to the sub panel. Connect the wires to the corresponding terminals in the sub panel. Install and connect the grounding and bonding wires. Securely close and cover the sub panel. Turn on the main power supply and test the sub panel for proper functioning.


What are the necessary steps for installing a 50 amp sub panel in a residential electrical system?

To install a 50 amp sub panel in a residential electrical system, you need to follow these steps: Turn off the main power supply to the house. Choose a suitable location for the sub panel. Install a new circuit breaker in the main panel for the sub panel. Run the appropriate gauge wire from the main panel to the sub panel. Connect the wires to the circuit breaker and the sub panel. Ground the sub panel according to local electrical codes. Turn on the main power supply and test the sub panel to ensure it is working correctly.


What are the necessary steps for installing a 60 amp sub panel in a residential electrical system?

To install a 60 amp sub panel in a residential electrical system, you need to follow these steps: Turn off the main power supply to the house. Choose a suitable location for the sub panel near the main panel. Install a new circuit breaker in the main panel for the sub panel. Run the appropriate gauge wire from the main panel to the sub panel. Connect the wires to the circuit breaker in the main panel and the sub panel. Ground the sub panel to the main panel and the grounding system. Install the sub panel cover and restore power to the system. It is important to follow all local electrical codes and regulations when installing a sub panel to ensure safety and compliance.


What are the necessary steps for installing a sub panel with a 100 amp capacity?

To install a sub panel with a 100 amp capacity, you will need to follow these steps: Determine the location for the sub panel and ensure it meets all local building codes. Turn off the main power supply to the area where the sub panel will be installed. Install a new circuit breaker in the main panel to supply power to the sub panel. Run the appropriate gauge wiring from the main panel to the sub panel. Connect the wiring to the circuit breaker in the main panel and the corresponding breaker in the sub panel. Ground the sub panel according to local codes. Install the sub panel in the designated location and connect all circuits to the breakers. Turn on the main power supply and test the sub panel to ensure it is functioning properly.


Is the main circuit board of the computer?

The main circuit board of the computer is the motherboard.