Work in Progress cost control is by nature compared to a budget set for that project.
Now if you don't have a budget it may be be3cause:
1) You don't have all the elements of the project worked out beforehand
2)You don't have a databank that would help you estimate the time, machine and labor cost to carry out the project.
Th remedy of both is:
1) To work out the elements that needs to be done preferaably in sequence.
2 Use a system like "successive calculation" to work the prelimonary estimate --a fast method of working the cost-plan/budget into yoiur budget and adjust as you ngo along.
To work the above into fruition a combination of spreadsheets and a progress-plan needs to be adhered to.
The above ois the guide-line and I can elaborate upon equest.
The basic philosophy is of course "balancing" the budget set-aside for any project.
"The Wayfahrer.
cost sheet
what are the importance of cost sheet?
Cost sheet is a statement, which shows various components of total cost of a product.It classifies and analyses the components of cost of a product. Previous periods data is given in the cost sheet for comparative study. It is a statement which shows per unit cost in addition to Total Cost. Selling price is ascertained with the help of cost sheet. The details of total cost presented in the form of a statement is termed as Cost sheet. Cost sheet is prepared on the basis of : 1. Historical Cost 2. Estimated Cost
There are three components of a cost sheet. These components are the prime cost, the factory cost, and the total cost.
How much does a sheet of Masonite cost
how we treat live stock in balancesheet
cost sheet is preapred before the manufactring and cost statement is prepared after manufactring.
Debtors is part of current asset and shown there in balance sheet.
cost sheets
Cost sheet of a company has expenses recorded in them. They mainly maybe short term cost's and long term cost's.
The cost for a bands sheet music will vary from band to band.
where we can involve in development of cost sheet