∙ 9y agono, not normally. It will cure more slowly and how much slower depends on how much dirt is piled on it.
all things that need to dry are based on 72 degrees concrete needs 30 days to fully cure.
Yes it can. It actually cures harder under water then above it. True.
Concrete never fully cures, but a non-quicksetting concrete should be firm on the surface in about 4-8 hours, and usable for foot traffic or post setting in 36 hours.
Not much you can do if the concrete is already hard, but if you are talking about plastic concrete (still in its wet state), there's lots you can do to hurt/weaken it:If you had the wrong chemical admixturesAny addition of water at the job site will weaken the concreteFailture to properly cure the concrete
28 days is the usual cure time for structural concrete. For street pavements and driveways made with 6-Sack concrete, 3 days of cure will support a car, but 7 to 10 days is required for it to support trucks. All concrete continues to cure forever, as long as moisture is present.
Yes and many so ask the supplier of your concrete.
Yes.
no, not normally. It will cure more slowly and how much slower depends on how much dirt is piled on it.
all things that need to dry are based on 72 degrees concrete needs 30 days to fully cure.
Yes it can. It actually cures harder under water then above it. True.
At least 3 days
Concrete never fully cures, but a non-quicksetting concrete should be firm on the surface in about 4-8 hours, and usable for foot traffic or post setting in 36 hours.
Not much you can do if the concrete is already hard, but if you are talking about plastic concrete (still in its wet state), there's lots you can do to hurt/weaken it:If you had the wrong chemical admixturesAny addition of water at the job site will weaken the concreteFailture to properly cure the concrete
5 days
New concrete will need to cure for several days. Depending on how much weight it is going to hold, this should be postponed as many extra days as possible.
All concrete need curing, since blinding is not structural concrete and treated as leveling course only, duration of curing may reduced. There is no specific period mentioned in relevant standard for curing of blinding.