Modular homes can be built (in America) in a matter of days.
Small one-story homes on a slab foundation can be built in a few weeks.
Average one-story homes with attic, basement, and garage, and built with permits and inspections usually take about 2 months for a moderate sized professional crew. Add a little time for a second story house.
Custom homes with all the trimmings can take 6 months to a year or more.
it takes about 1-5
35 days
Typically, it takes from six months to two years, depending on the project's size and complexity.
The time it takes to build a 2000 sq ft house from start to finish can vary, but on average it can take around 6-8 months.