answersLogoWhite

0


Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: How long do you load clay tiles on a roof before you drywall?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How much is a dump load of clay cost?

250.00 a load


How do you determine the load bearing capacity of a roof for concrete tiles?

elephant


What is the most likely material to be transported as suspended load?

clay.


What is a non load bearing wall made of?

Non load bearing walls are built just like every other wall with the excepttion of sheer walls they will have been sheeted with osb prior to drywall


What is the suspended load of a stream called?

'Suspension' or as you cited in your question 'suspended load'. Fine materials can be suspended in the water and are carried away in such a method. These particles are too light to sink to the bottom of the fast moving river. Suspension load forms the largest part of the river load. Materials that can be suspended include silt, mud and clay.


When should the operator tilt a load back on a forklift?

Once the load is off the ground and stable and before moving the load.


How do you get free cellphone load?

i need to answer the question first. then before i can get free cellphone load


What should you do before moving a load?

assess the distance between you and the load assess the centre of gravity


Can you make two bedrooms into one by cutting the opening in the wall or should you build a new supporting wall?

The ability to make two adjacent bedrooms into one by knocking down a wall depends on whether the wall is load bearing. Usually, the wall between two bedrooms is not load bearing, but it is possible that it is depending on the house. If you are unsure, then either look at your home's blueprint (plan) if your local authorities have it or if you are still unsure, hire a licensed engineer to determine whether the wall is load bearing. Even if the wall is not load bearing, it is a little more difficult to join the rooms than simply cutting a hole in the drywall. Behind the drywall there are studs which are either wood or metal. The studs need to be removed after the drywall is removed. Also there is most likely electrical wiring in the wall that needs to be removed and properly capped in the attic or crawl space. There may even be plumbing pipes in the wall which would require moving which is a major project in and of itself. Even after removing the drywall, studs, electrical wiring, and plumbing, there will be a gap in both the ceiling and the floor that needs to be addressed. To make a long story slightly shorter, while it is possible to join two adjacent rooms, it is a lot more involved than simply cutting down the drywall.


Which element is responsible for the actual rigging of the sling load?

The Supporting unit is responsible for the initial rigging of a sling load. It is then the Load Master's responsibility to check the load for deficiencies before actually shipping it .


Should utility shelf brackets be hung with the long end pointing down or pointing out?

it doesn't matter. the long end down means you can have a shallow shelf with greater load capacity. the short end means a larger shelf with less load capacity. please use the appropriate anchors when fastening to drywall.


What is a load cable?

Load cable generally means the final cable before the actual load. So on a clothes dryer the "Load Cable" would be the cable running from the outlet to the actual clothes dryer.