There were exactly 52 Mondays in the year 2011.
2250 Mondays.
17 i think
52
There were 39 Mondays during that time period.
Straddling the years 2011 and 2012, there are 35 Mondays between these two dates.
The Mondays - 2011 Pilot 1-1 was released on: USA: 11 October 2011
In most years there are 52 Mondays, but in every year that ends on a Monday, there are 53.
52 Mondays in 2009
There are 52 Mondays in 2008.
November: 5 Mondays December: 4 Mondays.
There will be 52 Mondays in 2010.
There were 52 Mondays in 2009.