(6 feet) x (2 feet) x (6 inches) =6 cubic feet
This would be 24 feet cubed
6x6x12= 432
So 432 Cubic Feet.
78 cubic feet (13 x 6 x 1 = 78)
That is 18 cubic ft.
That is 81 cubic feet.
There is no answer, as 5'x6' only describes one face of the bale. Also required is the front-to-back measurement.
Answer: 30 bfExplanation: 1 bf = 12"x12"x1" OR 144 cubic inches OR 144 in3The oak beam = 6"x6"x10' OR 6"x6"x120" OR 4320 in3Therefore, to divide the beam up in to board feet (bf):4320 in3 / 144in3 = 30 bf
A concrete pit 9'x12'x6' with 1' to 1-1/2' thick walls.
Let y+x=16n (sum of two forces)r=8n (resultant of forces)suppose x
Tell me more about the number "6"? is that feet or inches?
That is 420 cubic ft.
Convert everything to feet, then multiply length x width x height. Answer is in cubic feet.
That is 4608 cubic feet, so 4608 divided by 27 cubic feet per cubic yard equals 170.6666... cubic yards Answer It depends on what the area is measured in, inches, feet, yards or metres.
4' * 7' * 6' = 168 cubic feet
There is no answer, as 5'x6' only describes one face of the bale. Also required is the front-to-back measurement.
2/3 of a cubic yard = 6'x6'x4" 1 cubic yard = 9'x9'x4" 1/3 cubic yard = 3'x3'x4"
24 cubic feet . . . (6'x6'x 0.67')
4f x12
total volume = 3 x 2.5 x 6 = 45 cubic feet storage volume = 45 - 20 = 25 cubic feet
Answer: 30 bfExplanation: 1 bf = 12"x12"x1" OR 144 cubic inches OR 144 in3The oak beam = 6"x6"x10' OR 6"x6"x120" OR 4320 in3Therefore, to divide the beam up in to board feet (bf):4320 in3 / 144in3 = 30 bf
Volume = 11inches x 6inches x 4.5inches = 297 cubic inches