Cubic inches and square yards are two different measurements so this question cannot be answered.
6 inches = 1/6 yards. So 70 sq yards * 6 inches = 70*1/6 cubic yards = 11.66... cubic yards.
123.4568 cubic yards.
40.1 cubic yards
48 inches x 8 inches x 120 inches = 46080 cubic inches = 0.98765 cubic yards
2.3 cubic yards is 107,308.8 cubic inches.
2.59259 cubic yard
39.1116 cubic yards
0.619 cubic yards.
To convert from square feet to cubic yards, you need to account for the third dimension. Since you are dealing with a thickness of 2 inches, you first convert the 2 inches to feet (2 inches is 0.167 feet). Then, you multiply 4000 square feet by 0.167 feet to get the volume in cubic feet. Finally, convert cubic feet to cubic yards (1 cubic yard is equal to 27 cubic feet) to find the answer. In this case, 4000 square feet by 2 inches is equivalent to approximately 25.9 cubic yards.
280 / 9 square yards x 2 / 36 yards = 1.7284 cubic yards (about 1 3/4 cu yds)
At a poured depth of 4 inches, you will need 4.94 cubic yards.
For 576 square feet at a depth of 4 inches, you will need 7.11 cubic yards.