Incorrect. Square meters cannot be converted to cubic meters.
It is 70.41 cubic metres.
(0.77 cubic yard) x (27 cubic feet per cubic yard) = 20.79 cubic feet
According to concrete taxi: http://www.concretetaxi.com/faq.asp#77 ~15 wheelbarrow loads in a single cubic meter of concrete According to concrete taxi: http://www.concretetaxi.com/faq.asp#77 ~15 wheelbarrow loads in a single cubic meter of concrete
154 square feet x 0.5 feet deep = 77 cubic feet. 1 yard = 3 feet so 1 cubic yard = 3 feet x 3 feet x 3 feet = 27 cubic feet. 77 cubic feet * ( 1 cubic yard / 27 cubic feet ) = 2.85 cubic yards. so buy 3.
there are 2772 inches , that`s one yard has 36 inches is = to 3 feet
1.25 cubic feet - 77 cubic feet = -75.75 cubic feet.
There are 0.9144 metres in one yard. Therefore, 77 yards is equal to 77 x 0.9144 = 70.4088 metres.
77000 mm1 meter = 1000 millimeters 1 millimeter = 0.001 meter
There are 3 feet in one yard. Therefore, 77 feet is equal to 77/3 = 25.6 recurring (that is, 25.6666..) yards.
77/9 cubic yards for every inch of depth.
one meter is 1000mm 77mm/1000 = 0.077 m
7 m x 11 m = 77 sq meter
If you mean 50 inches by 40 inches by 77 inches, the volume would be 98.03 cubic feet. If you mean 50 feet by 40 feet by 77 feet, the volume would be 169400 cubic feet.