Incorrect. Square meters cannot be converted to cubic meters.
(0.77 cubic yard) x (27 cubic feet per cubic yard) = 20.79 cubic feet
According to concrete taxi: http://www.concretetaxi.com/faq.asp#77 ~15 wheelbarrow loads in a single cubic meter of concrete According to concrete taxi: http://www.concretetaxi.com/faq.asp#77 ~15 wheelbarrow loads in a single cubic meter of concrete
154 square feet x 0.5 feet deep = 77 cubic feet. 1 yard = 3 feet so 1 cubic yard = 3 feet x 3 feet x 3 feet = 27 cubic feet. 77 cubic feet * ( 1 cubic yard / 27 cubic feet ) = 2.85 cubic yards. so buy 3.
1.25 cubic feet - 77 cubic feet = -75.75 cubic feet.
there are 2772 inches , that`s one yard has 36 inches is = to 3 feet
There are 0.9144 metres in one yard. Therefore, 77 yards is equal to 77 x 0.9144 = 70.4088 metres.
77000 mm1 meter = 1000 millimeters 1 millimeter = 0.001 meter
77/9 cubic yards for every inch of depth.
There are 3 feet in one yard. Therefore, 77 feet is equal to 77/3 = 25.6 recurring (that is, 25.6666..) yards.
Multiply cubic meters by 1,000: 0.077 x 1,000 = 77 liters
one meter is 1000mm 77mm/1000 = 0.077 m
7 m x 11 m = 77 sq meter