Something on the order of .6 yards per US ton
1 cubic yard of crushed rock fills 3/depth in feet square yards.
Assuming a packing fraction of 74%, it would be 1/0.74 = 1.35 cubic yards.
To calculate the amount of crushed concrete needed for a 300' x 12' driveway, first find the area in square feet: 300 x 12 = 3,600 square feet. If you plan to have a depth of 4 inches (which is standard), convert that depth to feet (4 inches = 1/3 foot). Multiply the area by the depth: 3,600 x (1/3) = 1,200 cubic feet. Since there are 27 cubic feet in a cubic yard, divide by 27: 1,200 ÷ 27 ≈ 44.44 cubic yards. Therefore, you would need approximately 45 cubic yards of crushed concrete.
Depends on material. 1.25 yards of feathers is lighter that 1.25 yards of lead.
eighty-one dollars and twenty-five cents plus sales tax
About 35... there are 27cubic feet in one cubic yard so determine how many cubic feet you need and divide by 27... in your case 52x 18x 1= 936 cubic feet 936/27= 34.66 cubic yards
There are approximately 1.30795 cubic yards in a cubic meter.
52 cubic yards = 1,404 cubic feet.
To calculate the amount of crushed stone needed for a shed base measuring 11 feet by 15 feet and 4 inches deep, first convert the depth to feet: 4 inches is approximately 0.33 feet. Then, calculate the volume: 11 ft x 15 ft x 0.33 ft = 54.45 cubic feet. Since there are 27 cubic feet in a cubic yard, divide by 27 to find the total in cubic yards: 54.45 / 27 ≈ 2 cubic yards. Therefore, you will need about 2 cubic yards of crushed stone.
1 cubic foot = 0.037 cubic yards
0.619 cubic yards.
Divide cubic feet by 27 to get cubic yards.