To calculate the amount of crushed concrete needed for a 300' x 12' driveway, first find the area in square feet: 300 x 12 = 3,600 square feet. If you plan to have a depth of 4 inches (which is standard), convert that depth to feet (4 inches = 1/3 foot). Multiply the area by the depth: 3,600 x (1/3) = 1,200 cubic feet. Since there are 27 cubic feet in a cubic yard, divide by 27: 1,200 ÷ 27 ≈ 44.44 cubic yards. Therefore, you would need approximately 45 cubic yards of crushed concrete.
Crushed concrete is sold by the ton. One dumptruck will haul between 13 and 15 tons. Your driveway should take around 30 tons if covered 4" thick.
The term "yards" of concrete means cubic yards.
37.03 yards
25 Yards of concrete
.029 cubic yards of concrete weighs aproximately 93.96lbs
Crushed concrete is sold by the ton. One dumptruck will haul between 13 and 15 tons. Your driveway should take around 30 tons if covered 4" thick.
The formula I use is 15 tons = about 12 yards.
4"x16'x32' = 2.370370... cubic yards
20 times 50 divided by three is 333 1/3
16 ft * 47 ft * 4 inches =16/3 yards * 47/3 yards * 4/36 yards = 9.3 yards approx.
The term "yards" of concrete means cubic yards.
You will need 0.56 cubic yards of concrete.
You will need 17.8 cubic yards of concrete.
1.67 cubic yards.
0.89 cubic yards.
1.8 cubic yards will do it.
37.03 yards