4"x16'x32' = 2.370370... cubic yards
Multiply length times width. IF your driveway was 1 foot thick that would be the number of cubic feet of concrete. HOWEVER- it is only 4 inches thick. That is .33 ft (one third of a foot). So take your answer you got from multiplying LxW, and divide by 3. That will be the number of cubic feet of the driveway's volume.
About 3 1/2 ". 432 x .375 = 162cf / 27 = 6 cu yards
To calculate the amount of crushed concrete needed for a 300' x 12' driveway, first find the area in square feet: 300 x 12 = 3,600 square feet. If you plan to have a depth of 4 inches (which is standard), convert that depth to feet (4 inches = 1/3 foot). Multiply the area by the depth: 3,600 x (1/3) = 1,200 cubic feet. Since there are 27 cubic feet in a cubic yard, divide by 27: 1,200 ÷ 27 ≈ 44.44 cubic yards. Therefore, you would need approximately 45 cubic yards of crushed concrete.
One cubic meter of concrete has 1,000 liters. Therefore, 0.1 cubic meters of concrete would be 100 liters. This can also be expressed as 100,000 cubic centimeters.
An 80 pound bag of premix concrete will make .6 cubic feet of cured concrete. There are 27 cubic feet in a cubic meter, so it would take 45 80 pound bags to make one cubic meter.
387 cubic feet. This is because 43x18x0.5 (as six inches is 1/2 of a foot) =387.
The weight of concrete typically averages around 150 pounds per cubic foot. Therefore, 9 cubic feet of concrete would weigh approximately 1,350 pounds (9 cubic feet x 150 pounds per cubic foot). This can vary slightly based on the specific mix of the concrete used.
form_title=Concrete Driveway Contractors form_header=Drive on your new concrete driveway with help from a certified contractor. Is there an existing driveway that needs to be repaired or removed? = () Repaired () Removed () Unsure Is your driveway level?= () Yes () No () Unsure What are the dimensions of the driveway?=_ Ideal Completion Date=_
1.8 Cubic yards of concrete is 48.6 cubic feet. Each 80lb bag of concrete is .6 cubic feet. Therefore, you would need 81 bags. Hope that helps. GEO
To calculate the amount of concrete needed to cover a driveway that is 9 feet wide and 150 feet long, you first find the area by multiplying the width by the length: 9 feet × 150 feet = 1,350 square feet. The depth of the concrete layer is also needed to determine the volume. For example, if you want a thickness of 4 inches (0.33 feet), the volume would be 1,350 square feet × 0.33 feet = 445.5 cubic feet.
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
form_title=Concrete Sawing or Removal form_header=7723 Approximately how many cubic feet of concrete need to be cut or removed?*= {Select One,Small Area (Less than 500 sq ft),Medium Area (500 - 1000 sq ft),Large Area (Over 1000 sq ft} How would you like the cut concrete to be used ?*= () Service professional to remove concrete () Homeowner will dispose of concrete What type of concrete sawing are you in need of?*= () "To repair water or sewer pipe () To add drainage to yard () Remove part of patio, driveway or walkway () Demolish and remove entire concrete patio, driveway or walkway () Cut into concrete wall () Drill into concrete wall () Cut into masonry, brick, tile or other material () Other"