0.22 cubic yards.
0.04 cubic yards.
You'll need a minimum of 1.85 cubic yards for that size.
9.3 cubic yards of cement is required for this slab.
2.3 cubic yards is 107,308.8 cubic inches.
0.619 cubic yards.
Cubic feet needed is the thickness is 4 inches:416Cubic yards:15.3660 pound bags92580 pound bags 694
1.85 cubic yards of cement.
8.64 cubic yards of cement.
You will need 3.7 cubic yards of cement.
93,312 cubic inches.
186,600 cubic inches.
You will need 6.17 cubic yards of cement.