Generally 30 days brings concrete to to specified compression strength. Concrete may take 30 years to cure.

AnswerConcrete will harden to about 80% strength in 2-3 days and close to 100% strength in 28 days. Concrete driveways should be towards the latter end prior to driving on them. AnswerAs a former concrete inspector, I would agree with the first answer. AnswerConcrete takes 50 years to completely cure and then takes 50 years to break down
User Avatar

Wiki User

12y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How many days does cement take to cure completely?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Civil Engineering

How many types of cement?

there are 3type of cement1)opc (ordnary portland cement) 2)PPC (pozolan portland cement) 3) special cement


What are the different types of cement?

Type-I - Ordinary portland cement used in general constructionType-II - Portland pozzolana cement , moderate heat of hydrationType- III - Rapid hardening cement used for quick setting worksType-IV - low heat cement, low heat of hydrationType-V - Sulphate resisting cement used in sewage linings,marine construction.


What is the dry density of cement?

The cement density is used in the calculation of the total aggregate content and of the concrete density.Normal concrete has a density around 2400 kg/cubic meter or 4048 lb/cubic yard. There are many different kinds of concrete, many of which are much lighter. Cement is the liquid (or paste like) form, and tends to be much heavier than when it has cured into concrete. "Cement" is not concrete, but can be used to make concrete by mixing with sand, stone and water. The density of cement is about 3120kg/m3.


What is the setting and hardening of cement?

Setting of cement is the initial solidifying of the cement. I presume you will not be using a cement material by itself, but by mixing in aggregates and fines to create 'concrete' I will continue this answer talking about concrete but much still applied to a simple cement mortar also. Depending on temperature (warm fast, cold slow) initial set will be between 2 and 24 hours. This will result in a concrete material that can easily be marked with a fingernail. Once the concrete has set, the concrete goes through a process called curing or 'hardening' where the pozzolanic constituents of the concrete 'hydrate' (react with the water) to create a hard material. This will continue for the life of the concrete but the most significant strength gains will be noticed within the first 28 days and this is the strength normally taken as the design strength of the concrete. It can be expected in ideal conditions with warm air and a light breeze in the air, for the concrete to achieve 30% of it's 28 day strength in 1 day 60-80% in 3 days 80-100% in 7 days and 100-% in 28 days Many factors will affect this. temperature will have a large impact. additives such as retarders and accelerators can be added to slow and speed up the hardening process respectively.


How many cement bags required for the hollow brick masonry per cum?

35kg

Related questions

If your a little blind how many days will you eat carrots to completely see?

Carrots don't cure blind.


How many days to remove the braces of slab on a house?

after 16 days to cure then remove the support or braces.minimum of 16 days longer days much better.


What is the best cure for a not removing body's waste of human for how many days?

To go toilet duuh (!)


How many cubic meters in a 50kg bag of cement?

How many cubic meters in 1 cement bag of 50kgs


How many days does a chickenpox cure take?

depends on the individual. usually between 1-2 weeks


How many bags of cement is used for 1 bag of cement?

1


1m3 of cement equals how many 50kg cement bags?

20


How many types cement?

there are 3type of cement1)opc (ordnary portland cement) 2)PPC (pozolan portland cement) 3) special cement


How many types of cement?

there are 3type of cement1)opc (ordnary portland cement) 2)PPC (pozolan portland cement) 3) special cement


A cement truck can carry 20 tons of cement How many pounds of cement can the truck carry?

40000 POUNDS


How many days after finishing antibiotics ammo safe on Nuva ring?

It takes 30 days for the antibiotic to completely leave your body.


A cure notice must provide a contractor with a minimum of how many days to respond?

FAR part 49.402-3(d)